ClosedServicesMarktconsultatie

MJPV Skid Resistance Measurements 2026-2028

Rijkswaterstaat Centrale Informatievoorziening · Marktconsultatie · 1 lots · 369749
Type
Services
63712200
Estimated value
Not published
To deadline
Ongoing
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence high

Market Consultation for the execution of skid resistance measurements on the national road network for the period 2026-2028 by Rijkswaterstaat.

Services · Marktconsultatie · National procedure

Complete timeline
Contract type
Services
Marktconsultatie
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 63Services

01What is being requested

The assignment concerns the annual collection of the skid resistance parameter via the SWF method for approximately 15,000 km of lane. The term is 3 years with an option for a 1-year extension, starting in 2026.

This Market Consultation serves as preparation for the intended EU procurement MJPV Skid Resistance Measurements 2026-2028. The purpose of this procurement is to ensure the certainty/continuity of the production of MJPV skid resistance measurements in the coming years. The reason for the intended procurement skid resistance measurements 2026-2028 is that the term of the current Service Agreement expires at the end of 2025.

63712200Services
1MJPV Skid Resistance Measurements 2026-2028

02Strategic insight

Strategic insight · AI analysis
Ensure a BASt certificate that is renewed annually for the measuring equipment. Prepare for requirements regarding sustainability and the CO2-Prestatieladder. Take into account the obligation for the Safety Ladder at level 3.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 5
The measurements must be carried out at a constant speed of 80 km/h.Important
Measurements are not permitted after two weeks of dry weather.Important
The assignment can be divided into two lots (north and south).Important
Social return is applied based on the Groeituin methodology.Important
The collection and delivery take place in the period February through June.Important

04Can I take part?

Technical · 2
Measuring vehicle/equipment must be certified by the BASt according to the SKM standard.Technical
The certification of the equipment must be renewed annually.Technical
Other · 2
Application of the CO2-Prestatieladder.Other
Certification on the Safety Ladder (from 2025 at least level 3).Other

05Process & timeline

Publishing Market Exploration Document
4 maart 2025
Deadline for submitting questions
11 maart 2025
Publishing Memorandum of Information
14 maart 2025
Deadline for submitting questionnaire
26 maart 2025 om 12:00 uur
Individual explanatory interviews
1 en 2 april 2025
Completion and publication of final report
april 2025

06Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.

07Likely competitors

#Likely bidderFitWins
1AquaSwets B.VSME75
2Asset.InsightUnknown74
3Haskoning Nederland B.V.SME72
4TCN Infra Nederland B.V.SME71
5Kiwa KOACUnknown65
6Visscher Traffic B.V.SME60

08Tender documents

Marktconsultatieverslag EA MJVP StroefheidsmetingenpdfApr 29, 2025 · 243 KB
Nota van inlichtingen Marktconsultatie StroefheidpdfMar 14, 2025 · 83 KB
Handreiking Groeituin Social Return 2024pdfMar 4, 2025 · 632 KB
TN514529 - EF04 Vooraankondiging die alleen ter informatie wordt gebruikt - algemene richtlijn 20250304170904pdfMar 4, 2025 · 6 KB
Invulformulier Vragen en Antwoorden Marktconsultatie EA Stroefheidsmetingen v1.0docxMar 4, 2025 · 102 KB
Marktconsultatiedocument EA Stroefheidsmetingen v1.0pdfMar 4, 2025 · 441 KB

09Legal themes that may be relevant here

10Frequently asked questions

Why is a new procurement for skid resistance measurements being organized?
The reason for the intended procurement skid resistance measurements 2026-2028 is that the term of the current service agreements expires at the end of 2025.
What role do skid resistance measurements play within the Multi-Year Paving Plan (MJPV)?
The MJPV advice focuses on variable maintenance to manage the existing paving on national roads. This complies with requirements for quality characteristics such as skid resistance, evenness, and surface damage.
How is the quality of the skid resistance determined at Rijkswaterstaat?
Rijkswaterstaat has made firm agreements regarding the quality of the skid resistance and the rut depth in the form of Performance Indicators (PIN).

Automatically compiled from the official tender data and documents.

11Estimated value versus the market

p25
€ 443K
median
€ 1,2 mln
p75
€ 4,0 mln
deze opdracht

Gegunde waarden in CPV 63 · diensten n=110