Market exploration source network research De Polders
This trajectory investigates the feasibility of a source network versus individual heat pumps in the De Polders district to arrive at a definitive natural gas-free heat solution.
Works · Marktconsultatie · National procedure
01What is being requested
The research focuses on providing a substantiated choice between a source network or individual heat pumps for the De Polders district. The trajectory includes the technical and financial investigation of a maximum of 3 source network variants and providing support to residents who must replace their central heating boiler in the short term.
The Municipality of Houten is looking for information regarding market parties capable of drawing up a design for a source network (at concept or sketch level) for the municipality based on their own technology and design principles, and additionally providing insight into feasibility, costs, risks, scalability, and boundary conditions. • Provide insight into feasibility, costs, risks, scalability, and boundary conditions.
02Strategic insight
<ul Focus on the technical-economic feasibility of various source network concepts, where the balance between TNK (Total National Costs) and TCO (Total Cost of Ownership) is crucial. Ensure an approach that maximizes support and participation from residents and building owners, as affordability and social acceptance are decisive. Take into account the specific needs of different target groups, such as VvE's, social housing (Woonin), and utility buildings.
03Points of attention
04Award criteria
Investigation of (maximum) 3 variants of source networks and their comparison with the option of individual heat pumps per resident.
Support for residents who must replace their central heating boiler in the short term or wish to renovate, focused on temporary (no-regret) solutions or smart choices.
05Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
06Likely competitors
07Tender documents
08Legal themes that may be relevant here
09Frequently asked questions
What is the purpose of the source network research?
What requirements apply to the concept design?
What expertise is required for participation?
What are the technical advantages of a source network?