ClosedServicesMarktconsultatie

Market Consultation Water Management System (WBS)

Hoogheemraadschap van Delfland · Marktconsultatie · 1 lots · 365362
Type
Services
72212900
Estimated value
Not published
To deadline
Ongoing
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
1 criteria
Assess manuallyconfidence high

Market consultation for the development, implementation, and management of a new Water Management System (WBS) by Hoogheemraadschap van Delfland.

Services · Marktconsultatie · National procedure

Complete timeline
Contracting authority
Contract type
Services
Marktconsultatie
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 72Services

01What is being requested

Development and realization of a new Water Management System (WBS) including the maintenance and management phase for a minimum period of 9 years.

The Process Automation (PA) of the Water System is an essential component of the remote control and monitoring of the water system. In this process, geographically dispersed objects such as pumping stations and weirs are operated and monitored. Due to the following reasons, it is necessary to further develop this PA, whereby a partial replacement of the current PA is required: - The maintenance agreements for the current PA are expiring. - Further increasing the standardization of the PA in accordance with the PA Vision so that the number of systems is reduced and maintainability is improved.

72212900Services
1Market Consultation Water Management System (WBS)

02Strategic insight

Strategic insight · AI analysis
Prepare for a procedure via competitive dialogue. Ensure that you can substantiate your experience with SCADA/PLC systems and relevant certifications. Take into account a long-term maintenance agreement.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 5
The system must be based on platform software instead of custom software.Important
Communication between SCADA and PLCs should ideally take place via OPC UA.Important
The software generator must comply with the IEC61131-3 standard for interoperability.Important
A Proof of Concept is planned after award to demonstrate essential aspects.Important
The migration can take place via a parallel build-up and testing phase.Important

04Can I take part?

Technical · 3
Experience in developing and realizing control and visualization systems (SCADA/PLC) of this scale and this centralized setup.Technical
Experience in maintaining control and visualization systems (SCADA/PLC) of this scale and this centralized setup.Technical
Certification of employees for the applied SCADA/PLC platform software.Technical
Other · 1
Possession of an ISO 9001 and an ISO 27001 certificate.Other

05Award criteria

best price-quality ratio (BPKR)weight n/a

The bid price is adjusted with a fictitious discount based on quality criteria.

06Process & timeline

Proof of Concept (PoC)
4 maanden
Development and implementation
3 jaar
Minimum contract duration
9 jaar

07Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.

08Likely competitors

#Likely bidderFitWins
1Centric Netherlands B.V.SME9556×
2Afas Software B.V.SME9432×
3Visma Raet B.V.SME8618×
4Visma Circle B.V.SME8313×
5Sogeti Nederland B.V. SME8016×
6KPMG Advisory N.V.SME7915×

09Tender documents

Bijlage A PvE Beschrijvend WBSpdfJan 28, 2025 · 979 KB
Marktconsultatie WBSpdfJan 28, 2025 · 219 KB
TN508367 - EF04 Vooraankondiging die alleen ter informatie wordt gebruikt - algemene richtlijn 20250128090515pdfJan 28, 2025 · 6 KB
Marktconsultatie WBS_vragenlijst_invulbaardocxJan 28, 2025 · 63 KB

10Legal themes that may be relevant here

11Frequently asked questions

What is the purpose of developing the Process Automation (PA) of the Water System?
The development is necessary for the partial replacement of the current PA. This is required because maintenance agreements are expiring, there is an aim for more standardization in accordance with the PA Vision, a new operating strategy must be implemented, and to comply with CSIR measures for Cybersecurity for the purpose of the BIO.
What vision does the water system apply regarding the software used?
The water system must be developed based on 'Platform' software instead of 'custom' software. The reasons for this are the broad knowledge in the market, the ability to perform modifications independently, and transferability.
What requirements are set for the new software generator for PLC software?
The software generator must be able to generate PLC software that fully complies with the IEC61131-3 standard for programming languages. The goal is to no longer be dependent on one specific manufacturer, such as the current TBox PLC.
Which communication protocol is proposed for the connection between SCADA and PLCs?
Although the current communication between the SCADA and the PLCs in the field is based on Modbus TCP, the water system envisions that OPC UA is the most suitable protocol for the realization in terms of performance, maintainability, information security, and future-proofing.

Automatically compiled from the official tender data and documents.

12Estimated value versus the market

p25
€ 327K
median
€ 800K
p75
€ 2,5 mln
deze opdracht

Gegunde waarden in CPV 72 · diensten n=1436