ClosedSuppliesMarktconsultatie

Market Consultation - Renewable Energy Generation on Own Lands

ProRail B.V. · Marktconsultatie · 1 lots · 353335
Type
Supplies
09330000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
8 criteria
Assess manuallyconfidence high

ProRail is conducting a market consultation to determine the strategy for renewable energy generation on its own lands. The focus lies on the feasibility of contract structures and the desired procurement method for solar and wind energy.

Supplies · Marktconsultatie · National procedure

Complete timeline
Contracting authority
Contract type
Supplies
Marktconsultatie
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 09Suppliesrenewable energygenerationProRail

01What is being requested

Market consultation regarding the market approach for the development of solar and wind power installations on ProRail lands. The goal is to realize 100 GWh/year of renewable energy by 2030 at the latest through various contract structures.

Market consultation within the framework of the Renewable Energy Generation on Own Lands Programme

09330000Supplies
1Market Consultation - Renewable Energy Generation on Own Lands

02Strategic insight

Strategic insight · AI analysis
Participation in this market consultation provides insight into future contract structures such as DBFMOO. Focus on providing reasoned explanations for the questions instead of merely yes or no. During preparation, pay attention to risk management regarding grid congestion and permitting.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 5
The repurchase of power by ProRail mandates a tender in accordance with legislation.Important
The aim is local ownership in accordance with the climate agreement.Important
The procurement procedure is a competitive procedure with negotiation.Important
Innovations with a Technology Readiness Level 9 are being considered.Important
The contract duration for power purchase (PPA) is at least 15 years.Important

04Can I take part?

Financial · 1
Financial and economic standingFinancial
Technical · 3
Technical and organizational capabilityTechnical
Project management experience in the development of solar parks and/or wind turbinesTechnical
Project management experience in the operation and maintenance of solar parks and wind turbinesTechnical

05Award criteria

best price/quality ratio (BPKV)weight n/a

Awarding takes place based on a weighting of various elements where the price per kWh is expected to be dominant.

MWh to be produced per year per batch of locationsweight n/a

The amount of power to be produced per year in MWh is factored into the award to prevent only highly favorable locations from being developed.

Project management planweight n/a

Outline of the approach to achieve timely successful realization, including planning and risk management.

Realization periodweight n/a

Description of the realization period and measures for realization within congestion areas.

Sustainability and circularityweight n/a

Description of sustainable manufacturing, assurance, sustainable disposal/processing, and compliance with ecological requirements.

Price per kWhweight n/a

Fixed price per kWh for the produced power, excluding profile and imbalance costs.

Price per GVOweight n/a

Fixed price per Guarantee of Origin (GVO).

Lease pricesweight n/a

Fixed prices per hectare for the use of lands.

06Process & timeline

Publication / invitation to participate in market consultation
14 oktober 2024
Deadline for submitting answers
4 november 2024
Invitation to participate in individual interviews
14 november 2024
Individual interviews
20 november 2024
Sending draft report of individual interviews
28 november 2024
Receipt of comments on individual draft reports
9 december 2024
Publication of final report
17 december 2024

07Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for leveringen is € 221.000, for reference.

08Likely competitors

#Likely bidderFitWins
1De Groene Stroomfabriek N.V.SME8719×
2Eneco Zakelijk B.V.SME8621×
3E2-EnergieUnknown8110×
4N.V. Vattenfall Sales NederlandSME7816×
5De Vrije Energie Producent B.V.SME7813×
6Vattenfall Sales Nederland N.V.SME7313×

09Tender documents

Verslag Marktconsultatie Marktbenadering Ontwikkelaars opwekking duurzame energiepdfDec 16, 2024 · 392 KB
Bijlage A Lijst van LocatiespdfOct 15, 2024 · 101 KB
Bijlage B 02.Overeenkomst Windpark Maasvlakte 2 Versie ApdfOct 15, 2024 · 447 KB
Bijlage A-1 Voorbeeld 01 Deinum locatiebeschrijving V02pdfOct 15, 2024 · 634 KB
Marktconsultatie Marktbenadering Ontwikkelaars opwekking duurzame energiepdfOct 15, 2024 · 695 KB
Bijlage A-2 Intakekader ontwikkelen gronden (eerste schifting) V1.0pdfOct 15, 2024 · 1950 KB
Bijlage D Hoofdlijnen Programma ODE - Marktconsultatie ontwikkelaarspdfOct 15, 2024 · 765 KB
TN490380 - EF05 Periodieke indicatieve aankondiging die alleen ter informatie wordt gebruikt - sectorale richtlijn 20241015132520pdfOct 15, 2024 · 5 KB
Bijlage C Uitwerkingstabel basis - uitgebreidpdfOct 15, 2024 · 10 KB

10Legal themes that may be relevant here

11Frequently asked questions

What is the purpose of this market consultation?
The purpose is to collect market information regarding feasible, sustainable energy solutions that can be realized on ProRail's own properties, serving as a basis for a possible follow-up procedure.
Which technical topics are covered within the scope of the programme?
The consultation focuses on technical possibilities such as solar energy, wind, biogas, and combined heat and power plants, as well as economic feasibility and implementation planning.
Which aspects of the market approach are addressed during the consultation?
The consultation covers topics such as contract structure, the intended procurement procedure, ProRail as the off-taker of the produced power, participation, sustainability, and innovation.

Automatically compiled from the official tender data and documents.

12Estimated value versus the market

p25
€ 300K
median
€ 691K
p75
€ 2,0 mln
deze opdracht

Gegunde waarden in CPV 09 · leveringen n=226