PlannedWorksEuropean

Market Consultation Mowing

Waterschap Hollandse Delta · 1 lots · 413354
Type
Works
45233229-0 · Maintenance of verges
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence moderate

This document is a roadmap for the transition to clean and emission-free construction equipment in the construction sector to achieve nitrogen, climate, and fine dust goals. It provides a step-by-step plan and transition paths for various segments such as road, dike, rail, residential, and hydraulic engineering.

Works · European procedure

European
Contracting authority
Contract type
Works
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Maintenance of verges
Location
Netherlands
CharacteristicsCPV 45WorksEU tender

01What is being requested

The Clean and Emission-free Construction roadmap focuses on the sustainability of the use of mobile work, transport, and watercraft deployed in the construction sector. This includes, among other things, mobile tools (such as excavators and cranes), construction transport (supply and removal of materials) and vessel-based construction equipment (for coastline care, fairway maintenance, and offshore projects).

See market consultation for more information.

45233229-0Works
1Market Consultation Mowing

02Strategic insight

Strategic insight · AI analysis
<ul Take into account the four specific transition paths (WDS, W&U, KLZ & VGO and Energy) to align measures with the specific sub-segment. Anticipate the strict emission standards (stage standards) that increase over time for mobile tools. Pay attention to the economic lifespan of equipment, which for vessels can reach 25 to 30 years, influencing investment decisions.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 4
The roadmap focuses on the construction sector, whereby daily grounds maintenance falls outside the scope.Important
Emissions from the industrial production of construction materials fall outside the scope of SEB.Important
Construction-related passenger transport is currently not part of the roadmap.Important
For construction and demolition activities, under the Environment Act, there is an obligation to take adequate measures to limit nitrogen emissions (Article 7.19a Bbl).Important

04Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

05Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

06Likely competitors

#Likely bidderFitWins
1KWS Infra B.V.SME10092×
2Krinkels B.V.SME10064×
3Van Gelder BVSME10053×
4De Jong Zuurmond Infrabeheer, Onderhoud & Services B.V.SME10033×
5idverde Realisatie B.V.SME10037×
6Boskalis Nederland B.V.SME9969×

07Tender documents

Procedure marktconsultatie.pdfpdfFeb 24, 2026 · 28 KB
Vragen aan de markt.pdfpdfFeb 24, 2026 · 37 KB
Inleiding.pdfpdfFeb 24, 2026 · 26 KB
Klasse watergang - vegetatie.docxdocxFeb 24, 2026 · 107 KB
Marktconsultatie.pdfpdfFeb 24, 2026 · 32 KB
Achtergrond van het project.pdfpdfFeb 24, 2026 · 32 KB
Uitgangspunten en randvoorwaarden.pdfpdfFeb 24, 2026 · 31 KB
Routekaart SEB(13940782).pdfpdfFeb 24, 2026 · 18148 KB
Beschrijving.pdfpdfFeb 24, 2026 · 33 KB
Inkoopbehoefte.pdfpdfFeb 24, 2026 · 41 KB

08Legal themes that may be relevant here

09Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159