Market consultation Collective Heating plant
Market consultation for the realization of a hybrid heating plant in an existing building in Wageningen for 461 connections. The emphasis is on technical integration within strict spatial frameworks, nitrogen compliance, and future expandability.
Works · Marktconsultatie · National procedure
01What is being requested
The assignment concerns the realization of a complete heating plant for delivery to 461 consumers in Wageningen. The system must be able to deliver a peak load of 2.7 MW through a hybrid solution consisting of a heat pump (800 kW) and a gas boiler (LowNOx), including a buffer tank of at least 26 m³. The installation must be fully integrated within the existing building envelope of 22.5 x 8.5 x 4.4 meters.
This project aims to establish a complete district heating plant to supply 461 consumers in Wageningen, the Netherlands. The pipe network has already been contracted, and the tender for the heating plant itself is now imminent. The project is unique in that the heating plant must be integrated into an existing building located near protected nature and residential areas, where strict building regulations apply. The plant will be designed for a peak load of 2.7 MW, using a combined solution with a heat pump and gas boiler. A key consideration is compliance with the Netherlands’ strict nitrogen
02Strategic insight
Focus on an integral 3D design to fit all technical components within the strict building dimensions. Develop a phasing plan that takes nitrogen legislation into account, specifically regarding the installation of the gas boiler. Ensure a modular design that utilizes both the electrical capacity (up to 2 MVA) and the physical space for a larger buffer tank in the future.
03Points of attention
04Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
05Likely competitors
06Tender documents
07Legal themes that may be relevant here
08Frequently asked questions
What are the technical specifications for the heating plant?
What capacity is available for the heat pump and the electrical connection?
What are the requirements regarding the buffer installation?
How are nitrogen emission standards met?
Is there an opportunity to participate in an information meeting?
Automatically compiled from the official tender data and documents.
09Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159