PlannedWorksMarktconsultatie

Market consultation Collective Heating plant Muiderberg

Warmtebedrijf Muiderberg B.V. · Marktconsultatie · 1 lots · 412305
Type
Works
45350000 · Mechanical installatio
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence moderate

This is a market consultation for the realization of a sustainable heating plant in Muiderberg with a renewable energy content of 96%. The assignment includes the design, supply, and installation of complex heat storage and production components.

Works · Marktconsultatie · National procedure

Complete timeline
Contracting authority
Warmtebedrijf Muiderberg B.V.
Contract type
Works
Marktconsultatie
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Mechanical installations
Location
Netherlands
CharacteristicsCPV 45Works

01What is being requested

The project concerns the complete engineering, design, construction, and installation of a new heating plant and distribution network for the Muiderberg region. The assignment comprises three contract packages: Contract Package A (Heating Central), Contract Package B (WKO/TEO Systems) and Contract Package C (TTES Tank of 1,500 m³) to facilitate an annual heat demand of 20,420 MWh for approximately 1,200 consumers.

The Muiderberg District Heating Project represents a landmark development in renewable heating infrastructure for the Netherlands. Located near the IJmeer lake, this greenfield project will establish a fully sustainable heat supply system serving approximately 1,200 consumers with reliable, affordable heating whilst dramatically reducing the community's carbon footprint. This is more than infrastructure—it's a comprehensive energy transition demonstrating leadership in renewable heating technologies. Upon completion, the system will achieve a remarkable 96% renewable energy fraction, placing i

45350000Works
1Market consultation Collective Heating plant Muiderberg

02Strategic insight

Strategic insight · AI analysis
<ul Focus on multidisciplinary expertise where the integration of thermal storage (ATES and TTES) with the heat pump is central. Ensure a profound understanding of Dutch regulations regarding water extraction and building codes. Demonstrate the ability for advanced system optimization, specifically in the field of SCADA integration and weather-predictive management.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 5
Technical integration: Seamless coordination between various specialists is required for the interface between the heat pump, ATES, TEO, and the TTES tank.Important
Regulation: Compliance with the Waterwet, WKO permits, the Bouwbesluit, and requirements of the Hoogheemraadschap is mandatory.Important
Environmental impacts: During extraction from the IJmeer, ecological impact limits for temperature differences must be strictly managed.Important
Water quality: Attention must be paid to filtration, chemical dosing, and degassing in accordance with Dutch water chemistry and WKO guidelines.Important
Cybersecurity: SCADA and control systems must be equipped with robust cybersecurity measures and alarm management.Important

04Process & timeline

Start date
20 feb 2026
Deadline for receipt of questions
27 feb 2026
Deadline for sending answers
4 mrt 2026

05Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

06Likely competitors

#Likely bidderFitWins
1Combinatie Heijmans - SWARCOUnknown9573×
2Heijmans Infra B.V.SME9465×
3Dura Vermeer Infra Regionale Projecten BVSME9158×
4Van Gelder BVSME9153×
5BAM Bouw en Techniek bvSME8834×
6SPIE Nederland B.V.SME8823×

07Tender documents

Overzicht_marktconsultatie_TN571657 (1)pdfFeb 15, 2026 · 137 KB
Muiderberg-District-Heating-Project (1)pdfFeb 15, 2026 · 584 KB
TN572157 - EFE1 Vrijwillige aankondiging van voorafgaande marktconsultatie 20260215143356pdfFeb 15, 2026 · 140 KB

08Legal themes that may be relevant here

09Frequently asked questions

What is the technical scope of the project?
The project includes the complete design and construction of a new heating plant and a distribution network, utilizing a water-source heat pump of approximately 4 MW that extracts thermal energy from the IJmeer.
What requirements must the energy supply meet?
The system must achieve a renewable energy fraction of 96%. The technical briefing must meet this criterion of 96% processed energy.
What are the expected volumes and the number of users?
The expected annual heat demand is 20,420 MWh, including distribution losses, for a consumer base of approximately 1,200 connected users.
What experience is required from the bidder?
Bidders must have experience in the field of sustainable heat installations.

Automatically compiled from the official tender data and documents.