Market consultation Collective Heating plant Muiderberg
This is a market consultation for the realization of a sustainable heating plant in Muiderberg with a renewable energy content of 96%. The assignment includes the design, supply, and installation of complex heat storage and production components.
Works · Marktconsultatie · National procedure
01What is being requested
The project concerns the complete engineering, design, construction, and installation of a new heating plant and distribution network for the Muiderberg region. The assignment comprises three contract packages: Contract Package A (Heating Central), Contract Package B (WKO/TEO Systems) and Contract Package C (TTES Tank of 1,500 m³) to facilitate an annual heat demand of 20,420 MWh for approximately 1,200 consumers.
The Muiderberg District Heating Project represents a landmark development in renewable heating infrastructure for the Netherlands. Located near the IJmeer lake, this greenfield project will establish a fully sustainable heat supply system serving approximately 1,200 consumers with reliable, affordable heating whilst dramatically reducing the community's carbon footprint. This is more than infrastructure—it's a comprehensive energy transition demonstrating leadership in renewable heating technologies. Upon completion, the system will achieve a remarkable 96% renewable energy fraction, placing i
02Strategic insight
<ul Focus on multidisciplinary expertise where the integration of thermal storage (ATES and TTES) with the heat pump is central. Ensure a profound understanding of Dutch regulations regarding water extraction and building codes. Demonstrate the ability for advanced system optimization, specifically in the field of SCADA integration and weather-predictive management.
03Points of attention
04Process & timeline
05Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
06Likely competitors
07Tender documents
08Legal themes that may be relevant here
09Frequently asked questions
What is the technical scope of the project?
What requirements must the energy supply meet?
What are the expected volumes and the number of users?
What experience is required from the bidder?
Automatically compiled from the official tender data and documents.