AwardedSuppliesEuropeanOpen

Supply, maintenance and inspection of gym equipment

gemeente Westland · Open · 329974
Type
Supplies
37420000
Estimated value
€ 375K
awarded
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Westland intends to enter into a framework agreement for the supply, inspection and maintenance of gym equipment in its gymnasiums. The objective is to keep the equipment in good condition, replace worn parts in a timely manner, and minimize unnecessary capital destruction. The agreement has a base duration of two years with the possibility of extension for two additional years (2+1+1). The commencement date is planned for 1 October 2024. The procedure is public, but no CPV code has been specified. The tender focuses on a single contractor who will be responsible for the entire maintenance and replacement process, including inspections, repairs and the supply of new equipment. The municipality expects a transparent, cost-efficient and sustainable solution that meets the safety and quality standards for sports facilities.

Supplies · Open · European procedure

European
Contracting authority
Contract type
Supplies
Open
Estimated value
€375,000
awarded value
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 37SuppliesEU tendergym equipmentinspectionmaintenance

01What is being requested

The Municipality of Westland intends to enter into a framework agreement for the supply, inspection and maintenance of gym equipment in its gymnasiums. The objective is to keep the equipment in good condition, replace worn parts in a timely manner, and minimize unnecessary capital destruction. The agreement has a base duration of two years with the possibility of extension for two additional years (2+1+1). The commencement date is planned for 1 October 2024. The procedure is public, but no CPV code has been specified. The tender focuses on a single contractor who will be responsible for the entire maintenance and replacement process, including inspections, repairs and the supply of new equipment. The municipality expects a transparent, cost-efficient and sustainable solution that meets the safety and quality standards for sports facilities.

The objective of the tender is to maintain gym equipment in suitable condition for use in the Municipality's gymnasiums through inspections and maintenance. Additionally, it aims to replace gym equipment in a timely manner, with the goal of minimizing unnecessary capital destruction. 'n To meet this objective, the Municipality of Westland intends to enter into a framework agreement with one contractor for a period of two (2) years with the option to extend twice by one (1) year (2+1+1). The intended commencement date is 1 October 2024.

37420000Supplies

02Outcome

Awarded

Bosan B.V.

Award value
€375,000
Bidders
3

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for leveringen is € 221.000, for reference.

05Bidders in this segment

#Likely bidderFitWins
1Nijha B.V.SME10036×
2Janssen-Fritsen B.V.SME10019×
3Bosan B.V.SME9612×
4Kompan B.V.SME9642×
5Boer Speeltoestellen B.V. h.o.d.n. BOERplaySME9431×
6IJslander B.V.SME9327×

06Legal themes that may be relevant here

07Frequently asked questions

What is the intended duration of the framework agreement?
The framework agreement has a base duration of two years, with the possibility of two extensions of one year each (2+1+1).
What is the intended commencement date of the assignment?
The intended commencement date for the supply, inspection and maintenance of the gym equipment is 1 October 2024.
What is the objective of the assignment?
The objective is to keep gym equipment in suitable condition for use in gymnasiums through inspections and maintenance, as well as the timely replacement of equipment to minimize unnecessary capital destruction.
How many contractors will be appointed for this agreement?
A framework agreement will be concluded with one contractor who is responsible for the entire process of inspection, maintenance and replacement.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 280K
median
€ 880K
p75
€ 1,4 mln
deze opdracht

Gegunde waarden in CPV 37 · leveringen n=176