AwardedSuppliesEuropeanOpen

Supply, installation, monitoring and maintenance of solar panel installation

Type
Supplies
09332000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Stichting voor Algemeen Voortgezet Onderwijs, Beroepsonderwijs en Volwasseneneducatie (SAVV) is seeking a supplier for a complete solar energy installation. The contract includes the supply of PV modules, associated hardware and software, installation on school campuses, commissioning, continuous performance monitoring, and periodic maintenance. The procedure is public, ensuring all interested parties have an equal opportunity. The procurement focuses on a sustainable energy solution that reduces energy costs for the educational institutions and contributes to climate policy. The supplier must demonstrate experience with similar projects, be able to provide a reliable monitoring system, and offer a maintenance plan that meets the foundation's requirements.

Supplies · Open · European procedure

European
Contract type
Supplies
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
14:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 09SuppliesEU tendersolar panelsPV installationmonitoring

01What is being requested

The Stichting voor Algemeen Voortgezet Onderwijs, Beroepsonderwijs en Volwasseneneducatie (SAVV) is seeking a supplier for a complete solar energy installation. The contract includes the supply of PV modules, associated hardware and software, installation on school campuses, commissioning, continuous performance monitoring, and periodic maintenance. The procedure is public, ensuring all interested parties have an equal opportunity. The procurement focuses on a sustainable energy solution that reduces energy costs for the educational institutions and contributes to climate policy. The supplier must demonstrate experience with similar projects, be able to provide a reliable monitoring system, and offer a maintenance plan that meets the foundation's requirements.

The supply, installation, commissioning, monitoring and maintenance of a solar energy installation.

09332000Supplies
1Lot 1

02Outcome

Awarded

Sunprojects B.V.

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for leveringen is € 221.000, for reference.

05Bidders in this segment

#Likely bidderFitWins
1Eneco Zakelijk B.V.SME9121×
2De Groene Stroomfabriek N.V.SME8919×
3E2-EnergieUnknown8610×
4VanHelderUnknown8513×
5N.V. Vattenfall Sales NederlandSME8216×
6Gazprom Marketing & Trading Retail LimitedUnknown8116×

06Tender documents

TN262639 - SF03 Aankondiging van een gegunde opdracht 20200928071846pdfSep 28, 2020 · 25 KB
2de Nota van inlichtingen - Zonne-energie-installatiepdfJun 18, 2020 · 103 KB
Bijlage 12 -Aangepast indicatief legplan deel ApdfJun 9, 2020 · 205 KB
Bijlage 13.1 - Kalmoes HKL B LK-30pdfJun 9, 2020 · 122 KB
Bijlage 13.3 - Triangel HKL D1 ET-31pdfJun 9, 2020 · 210 KB
Bijlage 13.5 - Triangel HKL D2.2 ET-38pdfJun 9, 2020 · 126 KB
Bijlage 13 - Kalmoes HKL A ET-31pdfJun 9, 2020 · 185 KB
1ste Nota van inlichtingen - Zonne-energie-installatiepdfJun 9, 2020 · 241 KB
Bijlage 13.2 - Triangel HKL ABC LK-21pdfJun 9, 2020 · 276 KB
Bijlage 13.4 - Triangel HKL D2.1 ET-37pdfJun 9, 2020 · 262 KB
Bijlage 13.6 - Triangel HKL F ET-31pdfJun 9, 2020 · 120 KB
TN262639 - SF14 Kennisgeving van aanvullende informatie, informatie over een onvolledige procedure of rectificatie 20200506123931pdfMay 6, 2020 · 10 KB

07Legal themes that may be relevant here

08Frequently asked questions

What is the exact scope of the assignment?
The assignment includes the supply, installation, commissioning, continuous performance monitoring and periodic maintenance of the solar energy installation.
Which components are part of the supply?
The supply concerns PV modules, the associated hardware and the necessary software for the installation.
What is the nature of the requested monitoring and maintenance?
The contracting authority requires continuous monitoring of the solar energy installation's performance and a maintenance plan that meets the requirements set by the foundation.

Automatically compiled from the official tender data and documents.

09Estimated value versus the market

p25
€ 300K
median
€ 691K
p75
€ 2,0 mln
deze opdracht

Gegunde waarden in CPV 09 · leveringen n=226