AwardedSuppliesEuropeanOpenGreen

Supply and maintenance of blast cabinet (systems)

Type
Supplies
42924200
Estimated value
€ 1,70M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Supply and maintenance of a blast cabinet for the new Technology Centre Land (TCL) in Leusden. The tender is currently closed; the deadline was 4 November 2024. No value has been specified and only basic information is available.

Supplies · Open · European procedure

Sustainability countsEuropean
Contract type
Supplies
Open
Estimated value
€1,700,000
estimated value
Submission deadline
Ongoing
11:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 42SuppliesEU tenderGreen / SPP

01What is being requested

Supply and maintenance of a blast cabinet for the new Technology Centre Land (TCL) in Leusden. The tender is currently closed; the deadline was 4 November 2024. No value has been specified and only basic information is available.

The contracting authority hereby invites you to submit a bid for the tender 'Supply and maintenance of blast cabinet'.

42924200€ 1,70MSupplies
1Supply and maintenance of blast cabinet (systems)€1,700,000

02Outcome

Awarded

Straaltechniek International B.V.

Award value
€2,999,900
vs. estimate
+76%

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

€1,700,000

05Bidders in this segment

#Likely bidderFitWins
1Straaltechniek International B.V.SME71
2Steelco Benelux B.V.SME61
3Sulzer Pumps Wastewater Netherlands B.V.SME5862×
4Haller benelux B.V.SME58
5Technische Unie B.V.SME57
6TUWI Nederland B.V.SME57

06Legal themes that may be relevant here

07Frequently asked questions

What is the scope of the contract for the blast cabinet?
The contract includes the design, production, supply, and maintenance of a blast cabinet.
Where must the blast cabinet be installed?
The blast cabinet must be supplied and commissioned in the newly to be constructed Technology Centre Land (TCL) in Leusden.
What coordination is required for the placement of the blast cabinet?
The contractor must coordinate with the RVB (Rijksvastgoedbedrijf) and the relevant contractor to agree on when and how the blast cabinet can be placed in the new Technology Centre Land (TCL).
What is the expected timeline for the construction of the Technology Centre Land?
Construction is expected to start in Q2 2025 and completion of the construction is expected in Q1 2028.
Are there sustainability criteria applicable to this contract?
Yes, sustainability criteria are applicable to this contract.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 300K
median
€ 800K
p75
€ 4,0 mln
€ 1,7 mln

Gegunde waarden in CPV 42 · leveringen n=273