ClosedSuppliesEuropeanRestrictedGreen

Supply and installation of solar panels + solar energy storage system

Gemeente Bergen op Zoom · Restricted · 1 lots · 389756
Type
Supplies
09331000
Estimated value
€ 950K
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

This non-public tender by the Municipality of Bergen op Zoom (Stadlander as contracting authority) concerns the supply and installation of solar panels plus a solar energy storage system on flats owned by the housing corporation. The assignment is aimed at energy poverty subsidies (SPUK) and must be completed no later than 31 Oct 2026 (settlement 31 Oct 2026). The tender follows the amended Wet aanbestedingen 2012 and the project is subject to the SPUK specification conditions.

Supplies · Restricted · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Supplies
Restricted
Estimated value
€950,000
estimated value
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 09SuppliesEU tenderGreen / SPP

01What is being requested

This non-public tender by the Municipality of Bergen op Zoom (Stadlander as contracting authority) concerns the supply and installation of solar panels plus a solar energy storage system on flats owned by the housing corporation. The assignment is aimed at energy poverty subsidies (SPUK) and must be completed no later than 31 Oct 2026 (settlement 31 Oct 2026). The tender follows the amended Wet aanbestedingen 2012 and the project is subject to the SPUK specification conditions.

Stadlander was requested by the Municipality of Bergen op Zoom in mid-Q1 '24 to be involved in the project to combat energy poverty. Among the residents of Bergen op Zoom facing energy poverty are also tenants of the housing corporation Stadlander.  nDe Gemeente Bergen op Zoom aims to support these residents and has decided, in collaboration with Stadlander, to equip a number of flats, which are owned by Stadlander, with solar panels + solar energy storage system. For this purpose, so-called SPUK energy poverty subsidies are utilized. These SPUK subsidies have been granted to the Municipality

09331000€ 950KSupplies
1Supply and installation of solar panels + solar energy storage system€950,000

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

€950,000

04Likely competitors

#Likely bidderFitWins
1De Groene Stroomfabriek N.V.SME8219×
2Innova DuurzaamUnknown80
3Eneco Zakelijk B.V.SME7821×
4E2-EnergieUnknown7710×
5VanHelderUnknown7613×
6SO Industrial B.V.SME74

05Legal themes that may be relevant here

06Frequently asked questions

What is the exact scope of the assignment?
The assignment concerns the supply and installation of solar panels and a solar energy storage system, including all accessories for the flats of the housing corporation Stadlander.
When must the installations be delivered ready for use?
The installations must be delivered ready for use (turn-key) no later than 31 October 2026. The date 31 October 2026 also applies to the settlement.
To which specific conditions is the financing of this project tied?
The financing takes place through SPUK energy poverty subsidies from the Ministry of the Interior and Kingdom Relations. The funds must be spent and executed no later than 31 December 2026.
What additional information is expected from the contractor during the tender phase?
The contractor is required to provide an elaboration of a risk analysis during the tender phase.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 300K
median
€ 691K
p75
€ 2,0 mln
€ 950K

Gegunde waarden in CPV 09 · leveringen n=226