Supply and installation of traffic signs for the reduction of the maximum speed
Supply and installation of traffic signs and poles in Amersfoort to support a lower maximum speed. The award is based on the best price-quality ratio with a focus on the environmental cost indicator.
Supplies · Open · European procedure
01What is being requested
The contract concerns the removal of 240 traffic signs, the supply and installation of 900 traffic signs and 600 poles, the removal of 650 temporary stickers in a single night and processing changes in GeoVisia. The term of the agreement runs from 13 October 2025 to 30 January 2026.
The contract consists of the removal of 240 traffic signs, the supply and installation of 900 traffic signs and 600 poles in various neighborhoods in Amersfoort for the purpose of reducing the maximum speed. The removal of 650 temporary stickers in a single night and processing the changes in a revision in the GeoVisia management system.
02Outcome
POL Heteren B.V.
03Strategic insight
Ensure a complete bid without reservations in the general terms and conditions. Pay extra attention to the MKI value calculation via the mandatory calculation module. Submit all standard forms correctly and fully completed.
04Points of attention
05Can I take part?
06Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
07Award criteria
Award criterion Environmental Cost Indicator (MKI) within the best price-quality ratio.
Award criterion price within the best price-quality ratio.
Assessment takes place based on a system with fictitious discounts where price and the Environmental Cost Indicator (MKI) are assessed.
08Process & timeline
09Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for leveringen is € 221.000, for reference.
10Bidders in this segment
11Tender documents
12Legal themes that may be relevant here
13Frequently asked questions
What is the exact scope of the work regarding signage?
What work must be performed in the GeoVisia management system?
How should the Environmental Cost Indicator (MKI) be calculated?
Which specific tasks fall under the category of clearing and breaking works?
Automatically compiled from the official tender data and documents.
14Estimated value versus the market
€ 280K
€ 606K
€ 1,6 mln
Gegunde waarden in CPV 34 · leveringen n=1101