Supplier information for insulation materials, insulation glass and HR boilers in construction

Type
Services
79310000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

This public service procurement requests an annual study into insulation products and installed volumes for new and existing construction. The contracting authority (RVO) stipulates that the data collection must be shared in Excel format and a report must be delivered.

Services · Open · European procedure

European
Contract type
Services
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
13:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 79ServicesEU tender

01What is being requested

This public service procurement requests an annual study into insulation products and installed volumes for new and existing construction. The contracting authority (RVO) stipulates that the data collection must be shared in Excel format and a report must be delivered.

This assignment consists of conducting a study, including the delivery of data collection and reporting: the annual mapping of various insulation products, the volumes (volumes and type) from manufacturers, analyzing the results and reporting on them. It concerns insulation materials (including retrofit insulation), insulation glass and HR boilers in new and existing construction. In the annual study, all relevant material flows (broken down into categories) must be included, providing as complete an overview as possible. Annually, the data collection (via Excel sheets) is shared with the Con

79310000Services
1Supplier information for insulation materials, insulation glass and HR boilers in construction

02Outcome

Awarded

Buildsight b.v.

Bidders
1

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.

05Bidders in this segment

#Likely bidderFitWins
1I&O Research B.V.SME9827×
2BDO Audit & Assurance B.V.SME8857×
3Antea Nederland BVSME8535×
4Arcadis Nederland B.V.SME8532×
5Sweco Nederland B.V. SME8023×
6Maandag Interim Professionals B.V.SME60387×

06Tender documents

TN541220 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20251230154650pdfJan 1, 2026 · 143 KB
Nota van inlichtingen 2025-09-25-1pdfSep 25, 2025 · 3 KB
202505155 - TN541220 - Bijlage 2 Prijzen en tarievenxlsxSep 10, 2025 · 16 KB
202505155 - TN541220 - Bijlage 6 Ingevolge Verordening EU 2022-576docxSep 10, 2025 · 72 KB
202505155 - TN541220 - Aanbestedingsdocument_Leveranciersinformatie isolatiematerialen, -glas en HR-ketelspdfSep 10, 2025 · 578 KB
TN541220 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20250909131134pdfSep 10, 2025 · 9 KB
202505155 - TN541220 - Bijlage 4 DVO Leveranciersinformatie isolatie CONCEPTpdfSep 10, 2025 · 203 KB
202505155 - TN541220 - Bijlage 3 ReferentieverklaringdocxSep 10, 2025 · 35 KB
uea_541220_20250909125959pdfSep 10, 2025 · 364 KB
202505155 - TN541220 - Bijlage 5 KlachtenprocedurepdfSep 10, 2025 · 113 KB

07Legal themes that may be relevant here

08Frequently asked questions

What is the exact content of the annual assignment?
The assignment involves conducting an annual study into insulation materials (including retrofit insulation), insulation glass and HR boilers in new and existing construction. This includes mapping the volumes and types of manufacturers, analyzing the results and reporting on them.
In what manner must the data collection be provided?
The data collection must be shared annually with the contracting authority via Excel sheets. In addition, a report on the research results must be delivered.
Which material flows must be included in the study?
The study must include all relevant material flows of insulation materials (including retrofit insulation), insulation glass and HR boilers, with the flows being broken down into categories as completely as possible.

Automatically compiled from the official tender data and documents.

09Estimated value versus the market

p25
€ 200K
median
€ 640K
p75
€ 3,0 mln
deze opdracht

Gegunde waarden in CPV 79 · diensten n=4949