National - Passenger facilities at stations
Framework agreement for the management, maintenance, and rollout of passenger flow sensor installations at Dutch stations for a period of 4 to 8 years. The award will be based on the best price-quality ratio, where CO2 performance and technical criteria influence the evaluation price.
Services · Open · European procedure
01What is being requested
Framework agreement for the management and maintenance of all ProRail passenger flow sensor installations at stations in the Netherlands (currently at 5 stations), including associated hardware and software and data handling to the ProRail cloud. The assignment also includes the rollout of a small number of sensor installations during new installations or changes, with a duration of 4 years and 2 extension options of 2 years each (maximum duration 8 years).
Framework agreement for the management and maintenance of all ProRail passenger flow sensor installations at stations in the Netherlands (currently at 5 stations), including related hardware and software and data handling to the ProRail cloud, and the rollout of a (small) number of sensor installations during new installations or changes. The physical installation of new passenger flow sensor installations is not part of this framework agreement; this is provided by our in-house installer.
02Outcome
Siemens Mobility B.V.
03Strategic insight
Focus on achieving a high CO2 ambition level, as this directly leads to a fictitious discount on the evaluation price (up to 5%). Ensure a strong substantiation of the tender sum in the budget to meet the formal requirements. Verify the technical details of the data processing and fault signaling in the procurement guidelines, as these criteria influence the price calculation.
04Points of attention
05Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
06Award criteria
The quality value is a fictitious amount that is deducted from the tender sum based on the indicated CO2 ambition level (steps 1 to 5 with a discount of 1% to 5% respectively).
See procurement guidelines
See procurement guidelines
The tender with the best price-quality ratio concerns the offer with the lowest evaluation price. The evaluation price is calculated as: Tender sum minus fictitious quality discounts based on CO2 performance ladder, Data processing, and Fault signaling.
07Process & timeline
08Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.
09Bidders in this segment
10Tender documents
11Legal themes that may be relevant here
12Frequently asked questions
What is the exact scope of the framework agreement for the passenger flow sensor installations?
Is the physical installation of new sensors part of this assignment?
What technical conditions must the data handling meet?
Automatically compiled from the official tender data and documents.
13Estimated value versus the market
€ 327K
€ 800K
€ 2,5 mln
Gegunde waarden in CPV 72 · diensten n=1436