ClosedWorksOnderhandse procedureGreen

National - Realisation of TEV projects tranche 1

ProRail B.V. · Onderhandse procedure · 6 lots · 335934
Type
Works
45234000
Estimated value
€ 17M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

ProRail B.V. is offering a non-public negotiated procedure for the realisation of TEV projects tranche 1. The assignment includes reinforcing existing substations and constructing new substations to resolve bottlenecks in the Traction Power Supply (TEV). The works must be completed by 2024 at the latest and are divided into six lots. The procedure is based on ARN2016 Part II and the European call for competition via the ProRail Recognition Scheme (EP2019) for the Railway Contractors sector.

Works · Onderhandse procedure · National procedure

Sustainability counts
Contracting authority
Contract type
Works
Onderhandse procedure
Estimated value
€16,963,277
estimated value
Submission deadline
Ongoing
Scope
National
National procedure
Lots
6
6 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksGreen / SPPProRailTEVRailway Contractors

01What is being requested

ProRail B.V. is offering a non-public negotiated procedure for the realisation of TEV projects tranche 1. The assignment includes reinforcing existing substations and constructing new substations to resolve bottlenecks in the Traction Power Supply (TEV). The works must be completed by 2024 at the latest and are divided into six lots. The procedure is based on ARN2016 Part II and the European call for competition via the ProRail Recognition Scheme (EP2019) for the Railway Contractors sector.

The procurement is conducted as a non-public procedure based on ARN2016 Part II as well as the European call for competition published via the ProRail Recognition Scheme (EP2019), Railway Contractors sector division. In the context of the National Traction Power Supply programme, various bottlenecks in the Traction Power Supply (TEV) must be resolved nationwide to achieve various product steps. These bottlenecks will be resolved by reinforcing existing substations and realising new substations. The scope of the work that must be completed by 2024 at the latest constitutes the tranche 1 TEV

45234000€ 17MWorks
1Lot 1 Gelre (D-003082)€3,866,700
2Lot 2 Replacement of MV distribution equipment (L-005249)€1,918,926
3Lot 3 Den Haag (K-007011)€1,260,651
4Lot 5 Hilversum (L-005273)€3,268,000
5Lot 6 Dorst (R-557200)€1,650,000
6Lot 7 Gilze-Rijen (R-557200)€4,999,000

02Breakdown by lot

Lot 1 Gelre (D-003082)€3,866,700
Lot 2 Replacement of MV distribution equipment (L-005249)€1,918,926
Lot 3 Den Haag (K-007011)€1,260,651
Lot 5 Hilversum (L-005273)€3,268,000
Lot 6 Dorst (R-557200)€1,650,000
Lot 7 Gilze-Rijen (R-557200)€4,999,000

03Value in context

€16,963,277

04Likely competitors

#Likely bidderFitWins
1Strukton Rail Nederland bvSME9833×
2VolkerRail Nederland B.V.SME9730×
3BAM Infra B.V.SME9677×
4Heijmans Infra B.V.SME9565×
5Swietelsky Rail Benelux B.V.SME9422×
6ENGIE Infra & Mobility B.V.SME9369×

05Legal themes that may be relevant here

06Frequently asked questions

What is the intended completion date of the works?
The scope of the work that constitutes the tranche 1 TEV projects must be completed by 2024 at the latest.
On which regulations is the procurement based?
The procurement is based on ARN2016 Part II and the European call for competition via the ProRail Recognition Scheme (EP2019), Railway Contractors sector division.
Which sustainability requirements apply to this assignment?
Sustainability criteria apply to this procurement.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 17 mln

Gegunde waarden in CPV 45 · werken n=3159