AwardedWorksEuropeanRestricted

National - Framework Agreement DOP (Sustainable Platform Upgrading)

ProRail B.V. · Restricted · 1 lots · 280085
Type
Works
45200000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

ProRail B.V. is launching a national framework agreement for the sustainable upgrading of platforms (DOP). The contract includes large-scale maintenance and replacement of retaining walls, platform paving, and the implementation of the P76 standard, including civil engineering works for the replacement of station equipment. A maximum of four parties may participate, allocated via a key formula. It is expected that 50 to 75 projects will be carried out in the Netherlands between 2024 and 2030. The procedure is non-public, aimed at a fast and efficient allocation of the works.

Works · Restricted · European procedure

European
Contracting authority
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
13:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Utrecht
CharacteristicsCPV 45WorksEU tenderDOPplatformretaining walls

01What is being requested

ProRail B.V. is launching a national framework agreement for the sustainable upgrading of platforms (DOP). The contract includes large-scale maintenance and replacement of retaining walls, platform paving, and the implementation of the P76 standard, including civil engineering works for the replacement of station equipment. A maximum of four parties may participate, allocated via a key formula. It is expected that 50 to 75 projects will be carried out in the Netherlands between 2024 and 2030. The procedure is non-public, aimed at a fast and efficient allocation of the works.

Large-scale maintenance and replacement of retaining walls, (platform) paving, and bringing platforms up to the P76 standard as part of the station accessibility programme. The maintenance includes the straightening and replacement of retaining walls for an entire platform, the (partial) replacement of platform paving, as well as (civil) works for the replacement of station equipment. It concerns a framework agreement with multiple (maximum 4) parties using an allocation key. It is expected to involve 50 to 75 projects throughout the Netherlands between 2024 and 2030.

45200000Works
1Lot 1

02Outcome

Awarded

Aannemersbedrijf Wallaard Noordeloos B.V.

Bidders
7

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

05Bidders in this segment

#Likely bidderFitWins
1Dura Vermeer Infra Regionale Projecten BVSME10058×
2KWS Infra B.V.SME9692×
3BAM Infra B.V.SME9677×
4Heijmans Infra B.V.SME9665×
5GKB Realisatie B.V.SME9321×
6Anton Rail & Infra B.V.SME9321×

06Legal themes that may be relevant here

07Frequently asked questions

What is the expected scope of the works within this agreement?
It is expected that a total of 50 to 75 projects will be carried out throughout the Netherlands under this framework agreement between 2024 and 2030.
How are the assignments distributed among the contracting parties?
The framework agreement will be executed with a maximum of 4 parties who distribute the works by means of an allocation key.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159