AwardedSuppliesEuropeanOpen

National - Supply, installation, management, maintenance and further development of the [new] Wheel Impact Load Detection measurement park

ProRail B.V. · Open · 1 lots · 193679
Type
Supplies
34940000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

ProRail B.V. has a five-year framework agreement (option for 3 years) for the supply, installation, management, maintenance and further development of new WIM (Weighing in Motion) and WDD (Wheel Defect Detection) measurement systems. The agreement includes system acceptance and the award of sub-contracts for each installed measurement system. Each sub-contract has a duration of 15 years, starting from the installation of the system in the rail infrastructure. There are no running costs within the framework agreement; all costs are financed via the sub-contracts. The tender requires an integrated solution that meets technical, operational and safety standards, including data integration, maintenance strategies, and possibilities for further development. The tender is public and aimed at suppliers with experience in railway technology and measurement systems.

Supplies · Open · European procedure

European
Contracting authority
Contract type
Supplies
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
10:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Utrecht
CharacteristicsCPV 34SuppliesEU tenderWIMWDDrailway

01What is being requested

ProRail B.V. has a five-year framework agreement (option for 3 years) for the supply, installation, management, maintenance and further development of new WIM (Weighing in Motion) and WDD (Wheel Defect Detection) measurement systems. The agreement includes system acceptance and the award of sub-contracts for each installed measurement system. Each sub-contract has a duration of 15 years, starting from the installation of the system in the rail infrastructure. There are no running costs within the framework agreement; all costs are financed via the sub-contracts. The tender requires an integrated solution that meets technical, operational and safety standards, including data integration, maintenance strategies, and possibilities for further development. The tender is public and aimed at suppliers with experience in railway technology and measurement systems.

The present tender concerns one framework agreement for the supply, installation, management, maintenance and further development of new measurement systems for performing weight measurements (WIM; Weighing in Motion) and measurements in the field of wheel quality (WDD; Wheel Defect Detection).

34940000Supplies
1Lot 1

02Outcome

Awarded

voestalpine SIGNALING Siershahn GmbH

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for leveringen is € 221.000, for reference.

05Bidders in this segment

#Likely bidderFitWins
1Dynniq Nederland B.V.SME9440×
2Heijmans Infra B.V.SME8823×
3VRS Railway Industry B.V.SME79
4Siemens Mobility B.V.SME74
5BAM Infra Rail B.V.SME73
6Strukton Systems B.V.SME71

06Legal themes that may be relevant here

07Frequently asked questions

What is the duration of the framework agreement?
The framework agreement has a duration of five (5) years, with an option to extend by three (3) years.
What is the duration of an individual sub-contract?
The duration of a sub-contract is 15 years, calculated from the moment of installation and commissioning of the new measurement system in the rail infrastructure.
What is the scope of the assignment regarding the measurement systems?
The assignment concerns the supply, installation, management, maintenance and further development of new measurement systems for weight measurements (WIM; Weighing in Motion) and measurements in the field of wheel quality (WDD; Wheel Defect Detection).
Are there any running costs associated with the framework agreement?
There are no running costs within the framework agreement. All costs are financed through the award of sub-contracts for the supply, installation and management and maintenance of individual systems.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 280K
median
€ 606K
p75
€ 1,6 mln
deze opdracht

Gegunde waarden in CPV 34 · leveringen n=1101