Laadplein Parallelweg

Gemeente Etten-Leur · Marktconsultatie · 1 lots · 426206
Type
Works
45310000 · Construction of electr
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence moderate

The Municipality of Etten-Leur is conducting a market consultation to explore the possibilities for the realization and operation of a charging plaza at the location Parallelweg 1. The goal is to determine the procurement strategy and the scope of the assignment.

Works · Marktconsultatie · National procedure

Complete timeline
Contracting authority
Noord-Brabant
Contract type
Works
Marktconsultatie
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Construction of electricity
Location
Etten-Leur, Noord-Brabant
CharacteristicsCPV 45WorksCharging plazaCharging infrastructureElectric charging

01What is being requested

Market consultation for the realization and operation of a charging plaza at the location Parallelweg 1 in Etten-Leur. The municipality is investigating the possibilities for indoor charging in existing industrial halls with an expected available capacity of approximately 500 kW.

Municipality of Etten-Leur is the owner of Parallelweg 1 in Etten-Leur and is investigating the possibilities for the realization of a charging plaza at this location. It will not organize the development and operation itself. Through this market consultation, the municipality aims to form an image of the possibilities of the location, the interest from the market, and the demand for charging capacity in Vosdonk and in Etten-Leur.

45310000Works
1Laadplein Parallelweg

02Strategic insight

Strategic insight · AI analysis
<ul Focus on the technical feasibility of indoor charging and the required infrastructure within the existing halls. Provide explicit advice regarding the optimal utilization of the available capacity (approximately 500 kW) and any additional assets such as battery storage. Explore the synergy between the charging plaza and additional functions such as a mobility hub or secure parking.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 5
The market consultation is non-binding and does not grant any rights to participate in any potential future tender.Important
Sharing business-sensitive information in the questionnaire is at the market party's own risk.Important
The municipality is not obliged to realize the charging plaza or to conduct a tender.Important
The language during this market consultation is Dutch.Important
Any costs incurred for participation will not be reimbursed.Important

04Process & timeline

Publication market consultation / pre-announcement
Vrijdag 22 mei 2026
Closing of the period for parties to submit questions
Maandag 1 juni 2026, uiterlijk 10:00 uur
Publication of answers to questions by Municipality of Etten-Leur
Donderdag 4 juni 2026
Submission of questionnaire
Dinsdag 16 juni 2026, uiterlijk 12:00 uur

05Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

06Likely competitors

#Likely bidderFitWins
1ENGIE Infra & Mobility B.V.SME9569×
2Heijmans Infra B.V.SME9465×
3KWS Infra B.V.SME9292×
4Combinatie Heijmans - SWARCOUnknown9273×
5Van Gelder BVSME9153×
6SPIE Nederland B.V.SME8923×

07Tender documents

Bijlage 2 Uitwerking situatie Parallelweg 1 Etten-LeurpdfMay 22, 2026 · 490 KB
Bijlage 1 VragenlijstdocxMay 22, 2026 · 34 KB
Bijlage 3 Begane grond bedrijfspandpdfMay 22, 2026 · 2116 KB
Marktconsultatiedocument Laadplein Parallelweg 1 Etten-Leur Kenmerk K012398pdfMay 22, 2026 · 365 KB
TN589254 - EFE1 Vrijwillige aankondiging van voorafgaande marktconsultatie 20260522134347pdfMay 22, 2026 · 179 KB

08Legal themes that may be relevant here

09Frequently asked questions

What is the purpose of this consultation?
The purpose is to gain insight into the technical possibilities of the location, the interest from the market, and the demand for charging capacity in the Vosdonk and Etten-Leur region.
What is the expected capacity for the charging plaza?
The total available capacity amounts to 904 kW. Of this, approximately 500 kW is expected to be deployed for the charging plaza, while a portion may be made available to a nearby company.
Will the development and operation be carried out by the municipality itself?
No, the municipality will not organize the development and operation of the charging plaza itself.
How can I submit my response?
Submitting answers takes place via the digital environment of the contracting authority. A requirement is the correct completion and submission of the provided questionnaire (Annex 1).

Automatically compiled from the official tender data and documents.

10Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159