Kluizendok - Construction of Ring Rail and surrounding infrastructure
The contract concerns the construction of a 1 km long ring rail (Kluizendok) and the surrounding infrastructure for North Sea Port Flanders nv. The project includes extensive preparatory works, including measurements, the removal of existing vegetation, roads and paving, and the installation of temporary road signage. Earthworks (excavation, embankment, leveling, compaction and dewatering) are essential, as well as laying foundations for cycle paths, roads and the rail track. Bituminous paving for cycle paths and roads, the relocation of ditches, and the construction of gravel beds along the track are part of the work. Additionally, linear elements, small structures (retaining walls, outflow structures), signage, markings and road delineations are to be placed. A tunnel construction under a rail track to be built is also required. The procedure is a competitive procedure with negotiation, aimed at a high-quality, technically demanding project with significant logistical and environmental challenges.
Works · Competitive procedure with negotiation · National procedure
01What is being requested
The contract concerns the construction of a 1 km long ring rail (Kluizendok) and the surrounding infrastructure for North Sea Port Flanders nv. The project includes extensive preparatory works, including measurements, the removal of existing vegetation, roads and paving, and the installation of temporary road signage. Earthworks (excavation, embankment, leveling, compaction and dewatering) are essential, as well as laying foundations for cycle paths, roads and the rail track. Bituminous paving for cycle paths and roads, the relocation of ditches, and the construction of gravel beds along the track are part of the work. Additionally, linear elements, small structures (retaining walls, outflow structures), signage, markings and road delineations are to be placed. A tunnel construction under a rail track to be built is also required. The procedure is a competitive procedure with negotiation, aimed at a high-quality, technically demanding project with significant logistical and environmental challenges.
This contract concerns the construction of the rail track ring rail Kluizendok (approximately 1 km) and surrounding infrastructure and mainly includes: de o All measurements and preparatory works to enable the construction works at the intended location o The breaking up and removal of existing vegetation, roads and paving o The installation of temporary road signage o All earthworks in both excavation and embankment, including leveling and compaction, including dewatering if necessary o Construction of foundations for cycle paths, roads and rail track o Construction of bituminous pavi
02Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
03Likely competitors
04Tender documents
05Legal themes that may be relevant here
06Frequently asked questions
What is the scope of the construction of the rail track ring rail Kluizendok?
Which earthworks are part of the contract?
What infrastructure is being constructed alongside the rail track?
Which civil engineering structures are required within this project?
Which preparatory works must be carried out?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln