Climate-resilient polder Heerhugowaard Noord

Gemeente Dijk en Waard · Open · 1 lots · 297114
Type
Works
45240000
Estimated value
€ 1,14M
awarded
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Dijk en Waard is conducting an open procedure for an extensive works contract aimed at strengthening the polder in Heerhugowaard Noord. The project includes various clearing and water treatment activities, including the cleaning of waterways, the excavation, transport, and processing of soil, and the installation of culverts and siphons. Additionally, revetments, sheet piling, and automated weirs (with electromechanical installation) will be placed. The works also include the processing of paving foundation materials, the application of paving, and the monitoring of track geometry and related objects. The assignment requires an integrated approach to water management, infrastructure maintenance, and safety, with attention to environmentally friendly methods and compliance with national regulations.

Works · Open · National procedure

Contracting authority
Contract type
Works
Open
Estimated value
€1,142,000
awarded value
Submission deadline
Ongoing
11:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Heerhugowaard
CharacteristicsCPV 45Workspolderwaterway cleaningsluice

01What is being requested

The Municipality of Dijk en Waard is conducting an open procedure for an extensive works contract aimed at strengthening the polder in Heerhugowaard Noord. The project includes various clearing and water treatment activities, including the cleaning of waterways, the excavation, transport, and processing of soil, and the installation of culverts and siphons. Additionally, revetments, sheet piling, and automated weirs (with electromechanical installation) will be placed. The works also include the processing of paving foundation materials, the application of paving, and the monitoring of track geometry and related objects. The assignment requires an integrated approach to water management, infrastructure maintenance, and safety, with attention to environmentally friendly methods and compliance with national regulations.

The works mainly consist of: - performing various clearing works; - cleaning waterways; - excavating, transporting, and processing soil; - installing culverts and siphons; - installing revetments and sheet piling; - constructing automated weirs, incl. electromechanical installation; - processing paving foundation materials; - applying paving; - monitoring track geometry and track-related objects; - additional works.

45240000Works
1Lot 1

02Outcome

Awarded

K_Dekker bouw & infra b.v.

Award value
€1,142,000

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Bidders in this segment

#Likely bidderFitWins
1Boskalis Nederland B.V.SME10069×
2KWS Infra B.V.SME10092×
3Dura Vermeer Infra Regionale Projecten BVSME10058×
4Heijmans Infra B.V.SME10068×
5ENGIE Infra & Mobility B.V.SME10069×
6Combinatie Heijmans - SWARCOUnknown9975×

05Tender documents

TN411149 - SF03 Aankondiging van een gegunde opdracht 20230814075959pdfAug 14, 2023 · 29 KB
Nota van inlichtingen 2023-05-31-1pdfMay 31, 2023 · 3 KB
Nota van inlichtingen 2023-05-25-1pdfMay 25, 2023 · 2 KB
234423 (ARC-2022-034) KRP Heerhugowaard Noord PERCEEL 2rsxMay 8, 2023 · 335 KB
KLP-NW-Klimaat robuuste polder - M00014891-01pdfMay 8, 2023 · 1699 KB
TN411149 - SF02 Aankondiging van een opdracht 20230508122817pdfMay 8, 2023 · 35 KB
KLP-NW-Klimaat robuuste polder - M00014891-03pdfMay 8, 2023 · 1257 KB
234423 (ARC-2022-034) KRP Heerhugowaard Noord P3 - InschrijvingsstaatpdfMay 8, 2023 · 110 KB
erkenningsregeling-van-prorailpdfMay 8, 2023 · 236 KB
234423 (ARC-2022-034) KRP Heerhugowaard Noord P4 - InschrijvingsstaatpdfMay 8, 2023 · 91 KB
KLP-NW-Klimaat robuuste polder - M00014891-02pdfMay 8, 2023 · 1546 KB
Bijlage E Conceptplan SROI invullingdocxMay 8, 2023 · 21 KB

06Legal themes that may be relevant here

07Frequently asked questions

Which infrastructure and paving works are part of the assignment?
The works include the processing of paving foundation materials, the application of paving, and the monitoring of track geometry and track-related objects.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 1,1 mln

Gegunde waarden in CPV 45 · werken n=3159