Quay Replacement Houtzagerssingel

Gemeente Den Haag · Restricted · 269044
Type
Works
Estimated value
€ 6,26M
awarded
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Den Haag intends to replace the quay of the Houtzagerssingel as part of the Meerjaren Programma Kunstwerken 3. The foundation is in poor condition, making full replacement necessary. The assignment includes felling trees, removing old cables and pipes, replacing and raising the quay (approx. 370 m), planting new trees, creating new green strips in place of parking spaces, reusing lighting and installing street furniture, landscaping the ground level with 'hofstadkwaliteit' (city-center quality), moving the Albert Termote statue, and reinstating electric charging points. This is a non-public procedure, focused on an integrated approach to infrastructure, greenery, and public space.

Works · Restricted · European procedure

European
Contracting authority
Contract type
Works
Restricted
Estimated value
€6,257,000
awarded value
Submission deadline
Ongoing
11:00
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPVWorksEU tenderquay replacementHoutzagerssingelMunicipality of Den Haag

01What is being requested

The Municipality of Den Haag intends to replace the quay of the Houtzagerssingel as part of the Meerjaren Programma Kunstwerken 3. The foundation is in poor condition, making full replacement necessary. The assignment includes felling trees, removing old cables and pipes, replacing and raising the quay (approx. 370 m), planting new trees, creating new green strips in place of parking spaces, reusing lighting and installing street furniture, landscaping the ground level with 'hofstadkwaliteit' (city-center quality), moving the Albert Termote statue, and reinstating electric charging points. This is a non-public procedure, focused on an integrated approach to infrastructure, greenery, and public space.

In the ‘Meerjaren Programma Kunstwerken 3 (MJPKIII)’, the quay of the Houtzagerssingel between the Brouwersgracht and the Vaillantplein is included as part of the replacement task. This is because research has shown that the foundation of the quay is in poor condition. The scope of the project is as follows: • Felling the trees along the quay; • Clearing redundant cables and pipes during the regrading of the ground level; • Replacing and raising the current quay, over 370 linear meters; • Planting new trees, with sufficient growing space; • Creating new green strips at the location of the rem

Works

02Outcome

Awarded

Maas Holding B.V.

Award value
€6,257,000

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

05Bidders in this segment

#Likely bidderFitWins
1Maas Holding B.V. potentialSME40
2Aannemersbedrijf Wallaard Noordeloos B.V. potentialSME38
3Dura Vermeer Infra Regionale Projecten BV potentialSME38
4Aannemingsmaatschappij H. van Steenwijk B.V. potentialSME37
5Van Gelder BV potentialSME36
6Habo GWW bv potentialSME35

06Tender documents

TN341866 - SF03 Aankondiging van een gegunde opdracht 20230607101345pdfJun 9, 2023 · 29 KB
200094 - 2de Nota van Inlichtingen 1.0pdfSep 27, 2022 · 140 KB
200094 - Nota van Inlichtingen 1.0pdfSep 23, 2022 · 206 KB
200094 - Bijlage 4 Uniform Europees AanbestedingsdocumentpdfAug 4, 2022 · 2097 KB
200094 - Bijlage 8 Selectiecriterium in worddocxAug 4, 2022 · 38 KB
200094 - Bijlage 3,5 en 6 in worddocxAug 4, 2022 · 44 KB
TN341866 - SF02 Aankondiging van een opdracht 20220802152109pdfAug 4, 2022 · 34 KB
200094 - Selectieleidraad kadevervanging Houtzagerssingel 1.0pdfAug 4, 2022 · 623 KB
200094 - Bijlage 7 Referentieverklaring in worddocxAug 4, 2022 · 41 KB

07Legal themes that may be relevant here

08Frequently asked questions

What is the exact scope of the quay replacement?
The assignment includes the replacement and raising of over 370 linear meters of quay at the Houtzagerssingel, between the Brouwersgracht and the Vaillantplein.
Which works are carried out within the scope of the project?
The works consist of felling trees, clearing redundant cables and pipes, replacing the quay, planting new trees, creating green strips, reusing lighting, installing street furniture, and landscaping the ground level with 'hofstadkwaliteit'.
What is the specific assignment regarding the existing objects?
The project includes moving the 'Albert Termote' statue near the Vaillantbrug and reinstating electric charging points.
Why is the replacement of the quay at the Houtzagerssingel necessary?
The replacement is included in the Meerjaren Programma Kunstwerken 3 (MJPKIII) because research has shown that the foundation of the current quay is in poor condition.