Quay Replacement Houtzagerssingel
The Municipality of Den Haag intends to replace the quay of the Houtzagerssingel as part of the Meerjaren Programma Kunstwerken 3. The foundation is in poor condition, making full replacement necessary. The assignment includes felling trees, removing old cables and pipes, replacing and raising the quay (approx. 370 m), planting new trees, creating new green strips in place of parking spaces, reusing lighting and installing street furniture, landscaping the ground level with 'hofstadkwaliteit' (city-center quality), moving the Albert Termote statue, and reinstating electric charging points. This is a non-public procedure, focused on an integrated approach to infrastructure, greenery, and public space.
Works · Restricted · European procedure
01What is being requested
The Municipality of Den Haag intends to replace the quay of the Houtzagerssingel as part of the Meerjaren Programma Kunstwerken 3. The foundation is in poor condition, making full replacement necessary. The assignment includes felling trees, removing old cables and pipes, replacing and raising the quay (approx. 370 m), planting new trees, creating new green strips in place of parking spaces, reusing lighting and installing street furniture, landscaping the ground level with 'hofstadkwaliteit' (city-center quality), moving the Albert Termote statue, and reinstating electric charging points. This is a non-public procedure, focused on an integrated approach to infrastructure, greenery, and public space.
In the ‘Meerjaren Programma Kunstwerken 3 (MJPKIII)’, the quay of the Houtzagerssingel between the Brouwersgracht and the Vaillantplein is included as part of the replacement task. This is because research has shown that the foundation of the quay is in poor condition. The scope of the project is as follows: • Felling the trees along the quay; • Clearing redundant cables and pipes during the regrading of the ground level; • Replacing and raising the current quay, over 370 linear meters; • Planting new trees, with sufficient growing space; • Creating new green strips at the location of the rem
02Outcome
Maas Holding B.V.
03Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
04Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
05Bidders in this segment
06Tender documents
07Legal themes that may be relevant here
08Frequently asked questions
What is the exact scope of the quay replacement?
Which works are carried out within the scope of the project?
What is the specific assignment regarding the existing objects?
Why is the replacement of the quay at the Houtzagerssingel necessary?
Automatically compiled from the official tender data and documents.