AwardedWorksRestrictedGreen

Quay Replacement Conradkade

Gemeente Den Haag · Restricted · 1 lots · 262230
Type
Works
45243600
Estimated value
€ 5,84M
awarded
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Den Haag intends to replace the rotten wooden sheet pile wall of the Conradkade (400 m between Laan van Meerdervoort and Groot Hertoginnelaan) with a steel sheet pile wall including anchoring. The works include the redesign of the ground level with greenery, slope stairs and a path, and the realization of new revetment from the top of the slope down to the sheet pile wall to be replaced. The quay is part of a watercourse (50106-b). The construction of 19 storage units, which partially rest on piles in the water, falls outside the scope and will be carried out by third parties. The assignment is a non-public procedure and concerns a major civil engineering contract with significant structural and environmental aspects.

Works · Restricted · National procedure

Sustainability counts
Contracting authority
Contract type
Works
Restricted
Estimated value
€5,840,000
awarded value
Submission deadline
Ongoing
11:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Den Haag
CharacteristicsCPV 45WorksGreen / SPPquay replacementsheet pilesteel sheet pile

01What is being requested

The Municipality of Den Haag intends to replace the rotten wooden sheet pile wall of the Conradkade (400 m between Laan van Meerdervoort and Groot Hertoginnelaan) with a steel sheet pile wall including anchoring. The works include the redesign of the ground level with greenery, slope stairs and a path, and the realization of new revetment from the top of the slope down to the sheet pile wall to be replaced. The quay is part of a watercourse (50106-b). The construction of 19 storage units, which partially rest on piles in the water, falls outside the scope and will be carried out by third parties. The assignment is a non-public procedure and concerns a major civil engineering contract with significant structural and environmental aspects.

The quay wall of the Conradkade on the section between the Laan van Meerdervoort and the Groot Hertoginnelaan is in poor condition. The quay consists of an anchored wooden sheet pile wall upon which a stone riprap has been applied. The wooden sheet pile wall is rotten and therefore replacement must be carried out. The scope of the project Quay Replacement Conradkade includes the revetment over a length of approximately 400 meters at the Conradkade between the Laan van Meerdervoort and the Groot Hertoginnelaan (watercourse 50106-b). The scope of the project runs from the curbstone at the top o

45243600Works
1Lot 1

02Outcome

Awarded

Aannemingsmaatschappij H. van Steenwijk B.V.

Award value
€5,840,000
Bidders
3

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Bidders in this segment

#Likely bidderFitWins
1Dura Vermeer Infra Regionale Projecten BVSME10058×
2KWS Infra B.V.SME9992×
3BAM Infra B.V.SME9977×
4Heijmans Infra B.V.SME9865×
5Boskalis Nederland B.V.SME9770×
6Combinatie Heijmans - SWARCOUnknown9773×

05Tender documents

TN538049 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20250717102849pdfJul 17, 2025 · 10 KB
200037 - Nota van Inlichtingen - Kadevervanging ConradkadepdfJun 2, 2022 · 101 KB
2000037 - Selectieleidraad - Kadevervanging ConradkadepdfMay 20, 2022 · 462 KB
Bijlage 4 - Uniform Europees AanbestedingsdocumentpdfMay 20, 2022 · 2097 KB
2000037 - Bijlagen bij Selectieleidraad in WorddocxMay 20, 2022 · 109 KB
TN360203 - SF02 Aankondiging van een opdracht 20220520151044pdfMay 20, 2022 · 32 KB

06Legal themes that may be relevant here

07Frequently asked questions

What is the exact scope of the works at the Conradkade?
The assignment concerns the replacement of the revetment over a length of approximately 400 meters between the Laan van Meerdervoort and the Groot Hertoginnelaan (watercourse 50106-b). The current rotten wooden sheet pile wall will be replaced by a steel sheet pile wall with anchoring.
Which ground level works are part of the assignment?
The ground level must be redesigned. This includes the realization of greenery, slope stairs and a path. The scope runs from the curbstone at the top of the slope to the revetment to be replaced.
Will the placement of the 19 storage units be carried out within this assignment?
No, the construction of the 19 storage units, which partially rest on piles in the water and partially on the quay, falls outside the scope of this assignment and will be carried out by third parties.
Are there specific criteria regarding sustainability?
Yes, sustainability criteria apply to this assignment.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 5,8 mln

Gegunde waarden in CPV 45 · werken n=3159