Quay wall replacement and ground level redesign Zwarteweg-Boomsluiterskade in Den Haag
The Municipality of Den Haag intends to completely replace the quay walls at the Zwarteweg-Boomsluiterskade because the wooden foundation piles are worn out. The quay is part of a protected cityscape; the new construction must remain visually identical, but will be installed slightly higher to create extra space for trees. The total length of the wall to be replaced is approximately 230 m (Boomsluiterskade 130 m + Zwarteweg 100 m). The works include the removal of the current masonry balancing wall, the installation of new wooden foundation piles and a new masonry wall, and adjusting the height to approximately 50 cm above water level. The procedure is non-public, meaning a limited selection of contractors will be approached. The assignment requires precise coordination with the cityscape commission and the preservation of the historical appearance.
Works · Restricted · National procedure
01What is being requested
The Municipality of Den Haag intends to completely replace the quay walls at the Zwarteweg-Boomsluiterskade because the wooden foundation piles are worn out. The quay is part of a protected cityscape; the new construction must remain visually identical, but will be installed slightly higher to create extra space for trees. The total length of the wall to be replaced is approximately 230 m (Boomsluiterskade 130 m + Zwarteweg 100 m). The works include the removal of the current masonry balancing wall, the installation of new wooden foundation piles and a new masonry wall, and adjusting the height to approximately 50 cm above water level. The procedure is non-public, meaning a limited selection of contractors will be approached. The assignment requires precise coordination with the cityscape commission and the preservation of the historical appearance.
Research has shown that the foundation of the quay walls at the Zwarteweg-Boomsluiterskade is in poor condition, making total replacement of the quay walls desirable. The quay is constructed from wooden foundation piles with a masonry balancing wall on top. Both quays are relatively low, with a height of approximately 50 cm relative to the water level. The quay is part of a protected cityscape and must remain identical in appearance and aspect to the current situation. In the new situation, the quay will be installed slightly higher to create extra space for trees. The quay wall to be replaced
02Outcome
Dura Vermeer Infra Regionale Projecten BV
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
04Bidders in this segment
05Tender documents
06Legal themes that may be relevant here
07Frequently asked questions
What is the scope of the quay wall replacement?
What are the technical specifications for the new quay wall?
What requirements are made regarding the appearance of the new quay?
What is the reason for the replacement of the quay walls?
Automatically compiled from the official tender data and documents.
08Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159