AwardedWorksEuropeanOpen

Quay Construction Afrikahaven East Side (OZ)

Havenbedrijf Amsterdam N.V. · Open · 281499
Type
Works
45243600
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The tender concerns the construction of a new quay on the east side of Afrikahaven (OZ) by Havenbedrijf Amsterdam N.V. The project falls under EU procurement according to the Open procedure of the Aanbestedingsreglement Werken 2016. The assignment is a large-scale civil engineering construction with a focus on maritime infrastructure, in which the contractor is responsible for design, construction, material supply, safety and environmental management, and compliance with EU and national regulations. The delivery period is tight, with a completion date within 24 months, and the contracting authority expects a high-quality, sustainable, and safe construction result that integrates seamlessly with existing port facilities. The tender requires detailed project planning, experience with similar maritime projects, and robust quality assurance. The contracting authority offers a competitive price-quality ratio and a transparent evaluation procedure.

Works · Open · European procedure

European
Contracting authority
Contract type
Works
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
10:00
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderquay constructionAfrikahavenquay construction

01What is being requested

The tender concerns the construction of a new quay on the east side of Afrikahaven (OZ) by Havenbedrijf Amsterdam N.V. The project falls under EU procurement according to the Open procedure of the Aanbestedingsreglement Werken 2016. The assignment is a large-scale civil engineering construction with a focus on maritime infrastructure, in which the contractor is responsible for design, construction, material supply, safety and environmental management, and compliance with EU and national regulations. The delivery period is tight, with a completion date within 24 months, and the contracting authority expects a high-quality, sustainable, and safe construction result that integrates seamlessly with existing port facilities. The tender requires detailed project planning, experience with similar maritime projects, and robust quality assurance. The contracting authority offers a competitive price-quality ratio and a transparent evaluation procedure.

Havenbedrijf Amsterdam N.V., hereinafter referred to as the Contracting Authority, intends to realize the project ‘Quay Construction Afrikahaven East Side (OZ)’. To this end, it is conducting an EU procurement according to the ‘Open procedure’ in accordance with Chapter 2 of the Aanbestedingsreglement Werken 2016 (ARW 2016).

45243600Works

02Outcome

Awarded

Hakkers B.V.

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

05Bidders in this segment

#Likely bidderFitWins
1Boskalis Nederland B.V.SME9769×
2KWS Infra B.V.SME9692×
3BAM Infra B.V.SME9577×
4Dura Vermeer Infra Regionale Projecten BVSME9458×
5Van Gelder BVSME9453×
6Ploegam B.V.SME9422×

06Legal themes that may be relevant here

07Frequently asked questions

What is the expected completion period for the quay construction?
The completion date of the quay construction on the east side of the Afrikahaven must be realized within 24 months.
What are the main responsibilities of the contractor?
The contractor is responsible for the design, construction, material supply, safety and environmental management, and compliance with the relevant EU and national regulations.
What requirements are imposed on the quality of execution?
A high-quality, sustainable, and safe construction result is expected that integrates seamlessly with the existing port facilities, whereby robust quality assurance is required.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159