AwardedServicesEuropeanOpen

Integrated outdoor space maintenance industrial estate Haardijk

Gemeente Hardenberg · Open · 1 lots · 395965
Type
Services
77310000
Estimated value
€ 975K
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
1 criteria
Assess manuallyconfidence high

EU procurement for the integrated maintenance of the outdoor space at industrial estate Haardijk for the Municipality of Hardenberg. The award will be based on the lowest price.

Services · Open · European procedure

EuropeanComplete timeline
Contracting authority
Contract type
Services
Open
Estimated value
€975,000
estimated value
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 77ServicesEU tender

01What is being requested

It concerns the integrated maintenance of the outdoor space at industrial estate Haardijk, including grounds maintenance, watercourses, and weed control. The contract has an initial term of two years with six optional extensions of one year each.

The work consists of the maintenance of the outdoor space at industrial estate Haardijk. This includes: • Maintenance of and around trees • Maintenance of vegetation • Maintenance of grass vegetation (lawns and rough grass) • Maintenance of watercourses • Weed control on paving

77310000€ 975KServices
1Integrated outdoor space maintenance industrial estate Haardijk€975,000

02Outcome

Awarded

Grootgroener B.V.

Bidders
7

03Strategic insight

Strategic insight · AI analysis
Ensure a complete bid where all mandatory documents are correctly signed by an authorized representative. Take into account the strict SROI obligation during execution. Check whether the signature matches the recent extract from the commercial register.
Read automatically from the tender documents using AI. Always verify against the original documents.

04Points of attention

Important · 5
The use of chemical weed control agents is prohibited.Important
An SROI obligation of at least 5% of the wage bill applies.Important
The bid must be complete to prevent exclusion.Important
Documents such as the UEA, reference form, and price sheet must be legally signed.Important
Submitting variants is not permitted.Important

05Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

06Award criteria

lowest priceweight n/a

The Contract will be awarded to the most economically advantageous tender based on the lowest price.

07Process & timeline

Publication of descriptive document
07-10-2025
Closing date for submitting questions
20-10-2025, 12.00 uur
Publication of Note of Clarifications
27-10-2025
Closing date for submitting questions round 2
03-11-2025, 12.00 uur
Publication of Note of Clarifications round 2
07-11-2025
Final deadline for submission of Tenders
18-11-2025, 12.00 uur
Notification of provisional award decision
09-12-2025
End of appeal period
05-01-2026
Final award
06-01-2026
Effective date of Agreement
01-02-2026

08Value in context

€975,000

09Bidders in this segment

#Likely bidderFitWins
1Donker Groep B.V.SME10087×
2Krinkels B.V.SME10066×
3idverde Realisatie B.V.SME10046×
4SIGHT Landscaping b.v.SME10028×
5SIGHT Landscaping (SIGHT Landscaping b.v.)SME10029×
6Verkuil & Moree B.V.SME10022×

10Tender documents

TN550167 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20260119105634pdfJan 20, 2026 · 142 KB
Verduidelijking d.d. 13-11-2025pdfNov 13, 2025 · 118 KB
Nota van inlichtingen 1 Integraal onderhoud Haardijk 27 oktober 2025pdfOct 27, 2025 · 124 KB
20250926 Beheerkaart Haardijk (002)pdfOct 14, 2025 · 18880 KB
Bijlage 5 Verklaring geen Russische betrokkenheiddocxOct 9, 2025 · 35 KB
Bijlage 3 ReferentieformulierdocxOct 9, 2025 · 45 KB
Beschrijvend document Onderhoud openbaar groen industrieterrein HaardijkpdfOct 9, 2025 · 280 KB
TN550167 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20251007161650pdfOct 9, 2025 · 8 KB
Bijlage 6 ChecklistpdfOct 9, 2025 · 92 KB
Bijlage 7 - Handleiding SROIpdfOct 9, 2025 · 189 KB
Bijlage 2 UEApdfOct 9, 2025 · 342 KB
Bijlage 1 Bestek en bijlagenzipOct 9, 2025 · 861 KB

11Legal themes that may be relevant here

12Frequently asked questions

What exactly does the contract for the maintenance of industrial estate Haardijk entail?
The contract comprises the integrated maintenance of the outdoor space at industrial estate Haardijk. This concerns maintenance of and around trees, maintenance of vegetation, maintenance of grass vegetation (lawns and rough grass), maintenance of watercourses, and weed control on paving.
Which SROI obligations apply to this agreement?
Upon award, the contractor commits to allocating 5% of the invoiced wage bill to Social Return On Investment (SROI) activities. These activities must be directly attributable to the contract and must be carried out after the award of the agreement.
How must the contractor handle SROI obligations with subcontractors?
The SROI activities can be carried out by the contractor, a subcontractor, or a supplier. If the SROI is transferred to a subcontractor, the same provisions apply as for the contractor themselves. The contractor remains responsible for complying with and substantiating the obligations.

Automatically compiled from the official tender data and documents.

13Estimated value versus the market

p25
€ 260K
median
€ 600K
p75
€ 1,8 mln
€ 975K

Gegunde waarden in CPV 77 · diensten n=1648