ClosedWorksMarktconsultatie

Making fire station Belcampostraat 10 energy neutral through installation technology

Gemeente Utrecht · Marktconsultatie · 1 lots · 351836
Type
Works
45300000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence moderate

This project concerns making a fire station in Utrecht energy neutral through installation technology by means of underground thermal energy storage. The assignment is carried out by an installer as the main contractor in collaboration with a prescribed subcontractor.

Works · Marktconsultatie · National procedure

Complete timeline
Contracting authority
Contract type
Works
Marktconsultatie
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45Worksenergy neutralthermal storageunderground thermal energy storage

01What is being requested

The assignment concerns making the fire station at Belcampostraat 10 energy neutral by means of seasonal underground thermal energy storage. The works include installation technology adjustments by the main contractor and the realization of the thermal storage by a prescribed subcontractor, with a total contract value of € 3,700,000.00.

The main objective and thus the main assignment concerns making the fire station at Belcampostraat 10 energy neutral by means of seasonal underground thermal energy storage. It is primarily through this market consultation that we seek your vision on the following matters: • The deviating construction of a main contractor in collaboration with a prescribed subcontractor; • The process of energy management after completion; • The possibilities regarding demonstrating that the building is energy neutral; • Your vision on the specifications and the framework conditions

45300000Works
1Making fire station Belcampostraat 10 energy neutral through installation technology

02Strategic insight

Strategic insight · AI analysis
Prepare for a role as a main contractor where you work together with a specific subcontractor. Pay close attention to the demarcation of responsibilities between the parties. Ensure a vision for the energy management and the monitoring during the commissioning period.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 5
The construction works with a prescribed subcontractor (HoCoSto).Important
The main contractor has a commissioning period of two years after completion.Important
The design responsibility lies with the municipality.Important
A ceiling amount is used for the total assignment.Important
The assignment requires an SROI percentage of 2%.Important

04Process & timeline

Publication market consultation
03-10-24
Receipt of written responses
21-10-24
Sending invitations for interviews
29-10-24
Market consultation interviews
04-11-24 of 05-11-24
Market consultation report
08-11-24
Publication market consultation report
13-11-24

05Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

06Likely competitors

#Likely bidderFitWins
1Combinatie Heijmans - SWARCOUnknown9173×
2BAM Infra B.V.SME9177×
3Croonwolter&dros B.V.SME8925×
4BAM Bouw en Techniek bvSME8634×
5Heijmans Utiliteit B.V.SME8527×
6Unica Installatietechniek B.V.SME8013×

07Tender documents

GU Belcampostraat 10 - Marktconsultatieverslag 1v0pdfNov 13, 2024 · 390 KB
GU Belcampostraat 10 - Marktconsultatie Vraag en antwoordformulier 1v0docxOct 3, 2024 · 76 KB
GU Belcampostraat 10 - Marktconsultatieleidraad 1v0pdfOct 3, 2024 · 511 KB
TN488931 - EF04 Vooraankondiging die alleen ter informatie wordt gebruikt - algemene richtlijn 20241003101759pdfOct 3, 2024 · 6 KB

08Legal themes that may be relevant here

09Frequently asked questions

What is the main objective of this project?
The main objective is making the fire station at Belcampostraat 10 energy neutral through installation technology by means of seasonal underground thermal energy storage.
Which construction between main contractor and subcontractor is being considered?
A deviating construction is being considered in which an installer acts as the main contractor in collaboration with a subcontractor prescribed by the municipality.
What is the role of the main contractor after the completion of the thermal storage?
The intended main contractor is responsible for two years after the completion of the seasonal underground thermal energy storage for the correct commissioning of the installations to maintain energy neutrality.
Which topics are central during the market consultation?
The consultation focuses on the construction with the prescribed subcontractor, the process of energy management after completion, the possibilities for demonstrating energy neutrality, and the vision on the specifications and the framework conditions.

Automatically compiled from the official tender data and documents.

10Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159