CancelledWorksEuropeanInnovation partnership

Innovation partnership wastewater treatment Twence

Twence BV · Innovation partnership · 1 lots · 163927
Type
Works
45252127
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Twence B.V. is seeking an innovation partnership for the development and realization of an installation, including control systems, for the treatment of wastewater from the bottom ash washing installation (BAWI). Civil engineering and E&I works are excluded, but the scope may be expanded through three framework agreements for optimization, maintenance, integrated water treatment, and further processing of the bleed stream to produce raw materials. The partnership is intended to run through 2030 and covers both the construction and operational phases. The tender focuses on an innovative, sustainable solution that improves water quality, increases energy efficiency, and recovers valuable raw materials. The contracting authority expects a technical, financial, and operational plan, including a roadmap for implementation, maintenance, and continuous optimization.

Works · Innovation partnership · European procedure

European
Contracting authority
Contract type
Works
Innovation partnership
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Hengelo OV
CharacteristicsCPV 45WorksEU tenderwastewater treatmentBAWIinnovation partnership

01What is being requested

Twence B.V. is seeking an innovation partnership for the development and realization of an installation, including control systems, for the treatment of wastewater from the bottom ash washing installation (BAWI). Civil engineering and E&I works are excluded, but the scope may be expanded through three framework agreements for optimization, maintenance, integrated water treatment, and further processing of the bleed stream to produce raw materials. The partnership is intended to run through 2030 and covers both the construction and operational phases. The tender focuses on an innovative, sustainable solution that improves water quality, increases energy efficiency, and recovers valuable raw materials. The contracting authority expects a technical, financial, and operational plan, including a roadmap for implementation, maintenance, and continuous optimization.

The objective of the contracting authority is to conclude an agreement for at least the development and realization of an installation, including control systems, for treating the wastewater from the bottom ash washing installation (BAWI). The civil engineering and E&I works for this installation are in principle excluded from the scope. In addition, the scope may be expanded within 3 framework agreements to be concluded with: - Optimization of the BAWI wastewater treatment installation - Maintenance of the BAWI wastewater treatment installation - Integrated water treatment Twence (existin

45252127Works
1Lot 1

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1BAM Infra B.V.SME9577×
2Dura Vermeer Infra Regionale Projecten BVSME9558×
3ENGIE Infra & Mobility B.V.SME9469×
4Heijmans Infra B.V.SME9465×
5Van Oord Nederland BVSME9019×
6BAM Bouw en Techniek bvSME8934×

05Tender documents

TN221725 - SF03 Aankondiging van een gegunde opdracht 20220321164809pdfMar 21, 2022 · 23 KB
TN221725 - SF02 Aankondiging van een opdracht 20190423140006pdfApr 23, 2019 · 29 KB

06Legal themes that may be relevant here

07Frequently asked questions

What is the purpose of the requested installation?
The purpose is the development and realization of an installation, including control systems, for the treatment of the wastewater from the bottom ash washing installation (BAWI).
What is the expected duration of the agreements?
The agreements within this partnership are intended to run through the year 2030.
Which works are excluded from the scope?
The civil engineering and E&I works for the installation are in principle excluded from the scope.
In which areas can the scope be expanded via framework agreements?
The scope can be expanded via three framework agreements for the optimization of the installation, maintenance, integrated water treatment, and the further processing of the bleed stream for the production of raw materials.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159