IKC 's-Heerenberg engineering and contracting
The Municipality of Montferland wishes to involve a contractor in both the design and the realization of a project that combines existing buildings with new construction and sustainability improvements. The tender is non-public and consists of two phases: an engineering and design phase in which the contractor, together with a design team, develops a final design (DO+), and a realization phase in which the contractor executes the project. The contractor must be involved early in the process, provide expertise in design, and ensure an integrated, sustainable solution.
Works · Restricted · European procedure
01What is being requested
The Municipality of Montferland wishes to involve a contractor in both the design and the realization of a project that combines existing buildings with new construction and sustainability improvements. The tender is non-public and consists of two phases: an engineering and design phase in which the contractor, together with a design team, develops a final design (DO+), and a realization phase in which the contractor executes the project. The contractor must be involved early in the process, provide expertise in design, and ensure an integrated, sustainable solution.
For the design of the matter at hand, the Contracting Authority has tendered a design team (OT) which, in cooperation with the Contracting Authority, works out a Final Design + (DO+). Given the challenge in the project regarding the combination of existing buildings and new construction, alongside sustainability improvements, the Contracting Authority wishes to involve the contractor's expertise at an early stage. Therefore, in addition to the realization, the contractor will also be given responsibility in the design. The assignment and works to be tendered therefore relate to two phases. 1.
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What is the structure of the assignment for IKC 's-Heerenberg?
What specific challenges are involved in this project?
What is the role of the contractor in the design phase?
Automatically compiled from the official tender data and documents.