The design, implementation, and operational handover of the distribution stations for the Masterplan Power Grid at Schiphol
Schiphol Nederland BV has a tender for the design, implementation, and operational handover of distribution stations within the framework of the Masterplan Power Grid 2060. The assignment is aimed at increasing the electricity capacity of the airport to support the transition to electric transport and the reduction of fossil fuels. The new distribution stations must meet current and future requirements for safety, reliability, and scalability, and must be integrated with the existing grid and planned expansions. The procurement follows a non-public procedure, meaning only selected suppliers are invited to submit a proposal. The contracting authority expects a complete project plan, including design, construction, testing, delivery, and aftercare, with a focus on minimizing operational disruptions and ensuring the continuity of airport activities.
Works · Restricted · European procedure
01What is being requested
Schiphol Nederland BV has a tender for the design, implementation, and operational handover of distribution stations within the framework of the Masterplan Power Grid 2060. The assignment is aimed at increasing the electricity capacity of the airport to support the transition to electric transport and the reduction of fossil fuels. The new distribution stations must meet current and future requirements for safety, reliability, and scalability, and must be integrated with the existing grid and planned expansions. The procurement follows a non-public procedure, meaning only selected suppliers are invited to submit a proposal. The contracting authority expects a complete project plan, including design, construction, testing, delivery, and aftercare, with a focus on minimizing operational disruptions and ensuring the continuity of airport activities.
Following the Paris Agreement, SNBV has developed a vision to be emission-free with its own airport activities by 2030. To realize these ambitions, the use of natural gas and fossil fuels will be phased out, and as much as possible, a transition to electrically powered transport and equipment will be made. Consequently, the demand for electricity at Schiphol will increase. To ensure that the electricity network is future-proof and can meet the demand of all connected parties, Schiphol has drafted the Masterplan Power Grid (MPG) 2060.
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What is the objective of the assignment regarding the Masterplan Power Grid?
Why is the implementation of these distribution stations necessary for Schiphol Nederland BV?