The Municipality of Wijk bij Duurstede requests a complete redesign of the Zandweg between the Remus roundabout and the Steenstraat. This includes the renewal of all paving, sidewalks, parking spaces, cycle paths, and greenery. Additionally, the Steenstraat between the Zandweg and the Karel de Grotestraat will be redesigned, including the road and sewage system. Within the project, the construction of a roundabout at the Frankenweg is also included. The traffic light (VRI) at the Madelinushof and the public lighting fall outside the scope of this assignment. The project is a non-public procedure and concerns a work assignment without a CPV code. The tender focuses on an integrated approach to roads and infrastructure, with attention to mobility, safety, and aesthetics.
Works · Restricted · National procedure
01What is being requested
The Municipality of Wijk bij Duurstede requests a complete redesign of the Zandweg between the Remus roundabout and the Steenstraat. This includes the renewal of all paving, sidewalks, parking spaces, cycle paths, and greenery. Additionally, the Steenstraat between the Zandweg and the Karel de Grotestraat will be redesigned, including the road and sewage system. Within the project, the construction of a roundabout at the Frankenweg is also included. The traffic light (VRI) at the Madelinushof and the public lighting fall outside the scope of this assignment. The project is a non-public procedure and concerns a work assignment without a CPV code. The tender focuses on an integrated approach to roads and infrastructure, with attention to mobility, safety, and aesthetics.
The Zandweg redesign project entails the complete renewal of the paving on the Zandweg between the Remus roundabout and the Steenstraat, as well as the redesign and renewal of the road and the sewage system in the Steenstraat between the Zandweg and the Karel de Grotestraat. For both streets, sidewalks, parking spaces, cycle paths, and greenery will also be completely replaced within this task. Within this project, but outside this assignment, the traffic light (VRI) at the pedestrian crossing near the Madelinushof and the public lighting will also be replaced. Conversely, the construction of
02Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
03Bidders in this segment
04Tender documents
05Legal themes that may be relevant here
06Frequently asked questions
What exactly does the redesign of the Zandweg entail?
What works will be carried out in the Steenstraat?
Will a roundabout also be constructed within this project?
Which components fall outside the scope of this assignment?
Are there specific sustainability criteria applicable?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159