Redesign of residential streets Assumburg

Gemeente Heemskerk · Open · 1 lots · 366718
Type
Works
45222000
Estimated value
€ 4,59M
awarded
To deadline
Ongoing
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence high

The Municipality of Heemskerk requests the redesign of various residential streets, including sewerage, earthworks, and paving, with a target completion by the end of 2026.

Works · Open · National procedure

Contracting authority
Contract type
Works
Open
Estimated value
€4,595,000
awarded value
Submission deadline
Ongoing
15:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45Works

01What is being requested

The assignment concerns the redesign of residential streets Assumburg, consisting of breaking up, sewerage, drainage, earthworks, foundation, miscellaneous, paving, and seeding works.

The phased execution of a large-scale redesign of an existing residential area in Heemskerk

45222000Works
1Redesign of residential streets Assumburg

02Outcome

Awarded

Compeer - Huybens

Award value
€4,595,000
Bidders
5

03Strategic insight

Strategic insight · AI analysis
Develop a detailed phasing and accessibility plan that takes into account the accessibility of homes and emergency services. Ensure an up-to-date schedule that is regularly adjusted and communicated with the surrounding area. Develop creative solutions to ensure the continuity of the works within the specified accessibility criteria.
Read automatically from the tender documents using AI. Always verify against the original documents.

04Points of attention

Important · 8
Emergency services must be able to stand at a maximum of 80 meters from a home.Important
Waste bins must remain accessible within a maximum of 80 meters from the home.Important
Parking facilities must be available from a maximum of 80 meters from homes.Important
Garage areas must be inaccessible for as short a time as possible.Important
No construction traffic may drive over newly laid sections.Important
The contractor is the owner of released materials for certain items.Important
The maintenance period is 12 calendar months after completion.Important
A quality plan must be drawn up in accordance with the Standard.Important

05Can I take part?

Other — Upon award, the bidder commits to investing at least 2.5% of the contract sum towards increasing the labor participation of people with a distance to the labor market.

06Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

07Bidders in this segment

#Likely bidderFitWins
1Dura Vermeer Infra Regionale Projecten BVSME9658×
2KWS Infra B.V.SME9492×
3Boskalis Nederland B.V.SME9469×
4Combinatie Heijmans - SWARCOUnknown9373×
5Heijmans Infra B.V.SME9365×
6Gebrs. Kurvers B.V.SME9319×

08Tender documents

TN463926 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20250603170945pdfJun 3, 2025 · 8 KB
2025-01 WERKBESTEKpdfMar 3, 2025 · 15250 KB
2025-01 WERKBESTEKrsxMar 3, 2025 · 2334 KB
2025-01 Nota van InlichtingenpdfMar 3, 2025 · 391 KB
Nota van inlichtingen 2025-03-03-5pdfMar 3, 2025 · 54 KB
310 V2 INDICATIEF Kabels en leidingenpdfMar 3, 2025 · 7432 KB
uea_463926_20250213140823pdfFeb 13, 2025 · 1581 KB
Model ReferentieverklaringdocxFeb 13, 2025 · 20 KB
TN463926 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20250213144605pdfFeb 13, 2025 · 9 KB
330 Afkoppelen- infiltreren DEEL 3 A2pdfFeb 10, 2025 · 945 KB
Proefsleuven incl. fotobladenpdfFeb 10, 2025 · 8256 KB
324 Bodemonderzoeksgebied A0 TOTAALpdfFeb 10, 2025 · 2595 KB

09Legal themes that may be relevant here

10Frequently asked questions

What is the scope and the timeline of the redesign?
It concerns the phased execution of a large-scale redesign of an existing residential area in Heemskerk. The execution takes place from the spring of 2025 until the end of 2026.
Which works are carried out regarding the sewerage and drainage?
The works include the removal of sewers, gullies, inspection pits, gully pipes, and house connections, as well as the installation of a new main sewer (PVC pipes GMS) and drainage (including main drainage Ø 200 and Ø 125).
Which materials are applied according to the soil balance?
Various materials are used such as mixed aggregate, crushed stone aggregate, topsoil, hardstone, topsoil, bedding substrate, clean sand, and drainage sand.
What are the specific works regarding the paving?
The works include the breaking up of street bricks, concrete paving stones, concrete tiles, concrete curbs, traffic elements, and concrete slabs, as well as the palletizing and transporting of 30x30 tiles to the site.

Automatically compiled from the official tender data and documents.

11Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 4,6 mln

Gegunde waarden in CPV 45 · werken n=3159