OpenWorksOpen

Redesign Wendelstraat - Heistraat – Kerkraderweg

Gemeente Landgraaf · Open · 1 lots · 421866
Type
Works
45222000 · Civil engineering work
Estimated value
Not published
To deadline
-18d
May 29, 2026 · 10:00
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
1 criteria
Assess manuallyconfidence high

This project concerns the redesign of Wendelstraat, Heistraat, and Kerkraderweg in Landgraaf, where the contract will be awarded on the basis of the lowest price. Execution must take place within 200 working days and must comply with specific technical reference requirements and certifications.

Works · Open · National procedure

Complete timeline
Contracting authority
Contract type
Works
Open
Estimated value
Estimate not published
Submission deadline
May 29, 2026
10:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Civil engineering works, excluding bridges, tunnels, shafts and underground passages
Location
Netherlands
CharacteristicsCPV 45Works

01What is being requested

Redesign of the Wendelstraat, Heistraat and Kerkraderweg in the Municipality of Landgraaf. The works include, among other things, earthworks, sewerage works, the installation of paving and road and street furniture, with an execution period of a maximum of 200 working days.

Redesign Wendelstraat - Heistraat – Kerkraderweg

45222000Works
1Redesign Wendelstraat - Heistraat – Kerkraderweg in Landgraaf

02Strategic insight

Strategic insight · AI analysis
<ul Focus primarily on extremely competitive pricing, as the client explicitly states that there is no room to differentiate on quality or planning. Ensure a complete and correct breakdown of the contract sum in accordance with Standaard RAW 2025 to prevent rejection. Verify whether the technical references exactly meet the minimum size requirements (m1, diameter, m2, and tonnes) for both core competencies.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 6
The award will be based on the lowest price.Important
Submitting variants is not permitted.Important
The contract is not divided into lots.Important
In the event that the 200 working days are exceeded, a discount of 0.05% of the contract sum per calendar day applies (minimum € 1,000.00, maximum 20%).Important
The contractor cannot claim compensation if the start date is not met; costs for this must be included in the contract sum.Important
In the case of a combination of companies, all combining parties must possess an ISO 9001 certificate.Important

04Can I take part?

Financial · 3
Current and relevant business and professional liability insurance with a coverage of at least € 1,000,000.00 per event and at least € 2,500,000.00 per year.Financial
Bank statement of commitment for securing 5% of the contract sum.Financial
Current and relevant CAR insurance.Financial
Technical · 4
Reference Core Competency 1: A project where the bidder, to the satisfaction of the client, installed a sewerage system within an urban area of at least 48 m1 with a diameter of at least 600 mm, including matching sewerage inspection manholes, for a contracting authority (*).Technical
Reference Core Competency 2: A project where the bidder, to the satisfaction of the client, installed street works of at least 1,850 m2 and asphalt works of at least 700 tonnes within an urban area, for a contracting authority (*).Technical
Possession of a quality system certificate based on the NEN-ISO 9001-2008 standard or a comparable quality system, issued by a recognized certification body.Technical
Possession of a valid safety system certificate based on VCA.Technical

05Award criteria

Lowest priceweight n/a

The contract is awarded to the bidder with the most economically advantageous tender on the basis of the lowest price. The client sees no opportunities to differentiate on quality because the desired quality criteria are already sufficiently described in the specifications.

06Process & timeline

Publication of tender documents via www.tenderned.nl
Vrijdag 17 april 2026
Deadline for submitting questions (note of clarification)
Vrijdag 8 mei 2026
Deadline for sending Note of Clarification
Vrijdag 15 mei 2026
Deadline for receipt of Tenders
Vrijdag 29 mei 2026, uiterlijk 10:00 uur
Sending intention to award/rejections
Vrijdag 12 juni 2026
End of standstill period (20 days)
Vrijdag 3 juli 2026
Sending final award
Donderdag 9 juli 2026
Latest start date of work
Vanaf week 37 2026

07Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

08Likely competitors

#Likely bidderFitWins
1KWS Infra B.V.SME10092×
2Combinatie Heijmans - SWARCOUnknown10073×
3Boskalis Nederland B.V.SME10069×
4Heijmans Infra B.V.SME10065×
5Van Gelder BVSME10053×
6Dura Vermeer Infra Regionale Projecten BVSME9958×

09Tender documents

25-059-TEK-BO-OB-002-2.0pdfApr 17, 2026 · 1008 KB
25-059 - Archeologisch bureauonderzoek en verkennend booronderzoekpdfApr 17, 2026 · 7377 KB
25-059-TEK-BO-FAS-001-3.0pdfApr 17, 2026 · 2399 KB
25-059-BST-001-V1.0rsxApr 17, 2026 · 2092 KB
25-059-TEK-BO-DWP-001-3.0pdfApr 17, 2026 · 539 KB
25-059-RAP-001-inschrijvingsleidraad-V1.0pdfApr 17, 2026 · 1276 KB
25-059-BST-001-V1.0pdfApr 17, 2026 · 1609 KB
TN582339 - EFE3 Vrijwillige aankondiging van een opdracht 20260417135328pdfApr 17, 2026 · 185 KB
25-059 - OV-plan 20251217 ontwerp A1pdfApr 17, 2026 · 2122 KB
25-059-TEK-BO-BI-002-3.0pdfApr 17, 2026 · 4423 KB
25-059-TEK-BO-BI-001-3.0pdfApr 17, 2026 · 2739 KB
25-059-TEK-BO-OI-001-3.0pdfApr 17, 2026 · 2092 KB

10Legal themes that may be relevant here

11Frequently asked questions

What experience requirements are imposed on the bidder?
Bidders must have at least 3 years of experience in urban civil redesign and possess an experienced project team.
What obligations apply regarding environment and archaeology?
Stringent environmental legislation and archaeological obligations apply. If adequate environmental options are not offered, the contract may be cancelled.
What traffic facilities must be realized?
The execution includes creating a traffic plan, providing diversions, and arranging detours.
What soil investigations were carried out for this project?
Environmental technical investigations and infiltration studies have been carried out, including soil ecology infra partial inspection.

Automatically compiled from the official tender data and documents.

12Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159