The Municipality of Voerendaal intends to redesign the east side of the city. The project includes the installation of a new RWA sewer and reinforcing the existing sewer, the complete decoupling of rainwater from paved surfaces, the redesign of roads and intersections, and the optimization of traffic flow. Additionally, the aim is to achieve structural sustainable greening by reducing paved surfaces and, where possible, planting continuous rows of trees or localized tree clusters. The tender is non-public and focuses on an integrated approach to infrastructure, water management, and greenery provision.
Works · Restricted · European procedure
01What is being requested
The Municipality of Voerendaal intends to redesign the east side of the city. The project includes the installation of a new RWA sewer and reinforcing the existing sewer, the complete decoupling of rainwater from paved surfaces, the redesign of roads and intersections, and the optimization of traffic flow. Additionally, the aim is to achieve structural sustainable greening by reducing paved surfaces and, where possible, planting continuous rows of trees or localized tree clusters. The tender is non-public and focuses on an integrated approach to infrastructure, water management, and greenery provision.
The following objectives are pursued in the project: • Installation of new RWA sewer and reinforcement of existing sewer • Complete decoupling of rainwater from paved surfaces • Redesign of roads and intersections • Optimization of traffic flow • Structural sustainable greening at the expense of paved surfaces • Planting continuous rows of trees and/or localized trees where possible. See the description in the selection document
02Outcome
BESIX Infra Nederland B.V.
03Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
04Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
05Bidders in this segment
06Tender documents
07Legal themes that may be relevant here
08Frequently asked questions
What are the main technical objectives of the Herinrichting Voerendaal Oost project?
What requirements are set for greening within this project?
Automatically compiled from the official tender data and documents.
09Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159