The Municipality of Utrecht is tendering the redesign of Lombokplein in two phases: a design and work preparation phase (Design Team phase) and an implementation phase (Realization phase). The project includes the extension and restoration of the Leidse Rijn, straightening the cycle path along the river, and the realization of buildings. Additionally, the current Westplein will be redesigned with a focus on restoring the urban fabric and transforming the traffic corridor into a city street with a 2x1 lane configuration and a 30 km/h speed regime. The Graadt van Roggenweg will also be converted into a more easily crossable city street with enhanced quality of stay. The assignment requires an integrated approach to water management, traffic safety, mobility, and urban design.
Works · Restricted · European procedure
01What is being requested
The Municipality of Utrecht is tendering the redesign of Lombokplein in two phases: a design and work preparation phase (Design Team phase) and an implementation phase (Realization phase). The project includes the extension and restoration of the Leidse Rijn, straightening the cycle path along the river, and the realization of buildings. Additionally, the current Westplein will be redesigned with a focus on restoring the urban fabric and transforming the traffic corridor into a city street with a 2x1 lane configuration and a 30 km/h speed regime. The Graadt van Roggenweg will also be converted into a more easily crossable city street with enhanced quality of stay. The assignment requires an integrated approach to water management, traffic safety, mobility, and urban design.
The Lombokplein project is being tendered using a two-phase approach, consisting of the Construction Team phase and the Realization phase. In the Design Team phase, there is a design and work preparation task which must be further elaborated in preparation for the Realization phase. The redesign concerns, among other things, the extension and restoration of the Leidse Rijn. The water will be reduced, the cycle path along it will be straightened, and buildings will be constructed along the route. Additionally, the redesign of the current Westplein. Here, the task is primarily to restore the ur
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
04Likely competitors
05Tender documents
06Legal themes that may be relevant here
07Frequently asked questions
What phases does the assignment for the redesign of Lombokplein consist of?
What are the main components of the redesign of the Leidse Rijn?
What changes are being implemented at Westplein?
What is the task for the Graadt van Roggenweg?
Automatically compiled from the official tender data and documents.
08Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159