Kamp Westerbork Memorial Centre Construction Team Contractor
Phased renewal of Kamp Westerbork Memorial Centre in construction team collaboration, consisting of design development and realization of three activities within a fragile nature area.
Works · Open · European procedure
01What is being requested
The assignment concerns the design development in construction team collaboration and the phased realization of the renewal of the Kamp Westerbork Memorial Centre. The project is divided into three consecutive activities (A, B, and C) with a total ceiling budget of € 12,500,000.
The assignment concerns the phased renewal of the Kamp Westerbork Memorial Centre. This renewal is necessary to make the centre future-proof and to better receive, inform, and touch visitors in the future. The current facilities do not sufficiently align with the ambitions regarding commemoration, education, and sustainability, and the routing and infrastructure also require adjustment.
02Strategic insight
<ul Ensure a Partnership where the building contractor and the infra contractor are jointly and severally liable to meet the legal requirements. Focus strongly in the Plan of Approach on the specific ambitions: Paris Proof, Nature Positive, and Radio Quiet. Ensure that all mandatory certificates (ISO, VCA, ERM BRL 3000) are current and valid at the company level.
03Points of attention
04Can I take part?
05Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
06Award criteria
Assessment of the requirements set in the qualitative award criteria.
Assessment based on the Tender Form (Form B).
07Process & timeline
08Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
09Likely competitors
10Tender documents
11Legal themes that may be relevant here
12Frequently asked questions
What is the core of the assignment for the construction team contractor?
Which suitability criteria must bidders meet?
What are the main technical and substantive focus points of the renewal?
What specific requirements apply to the selection of the construction team contractor?
What is the nature of the intended form of cooperation?
Automatically compiled from the official tender data and documents.
13Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159