ClosedSuppliesEuropeanRestricted

Heat Source Zeeburg, Production, delivery and installation of a Heat Buffer Tank (Lot 1)

Vattenfall N.V. · Restricted · 1 lots · 290434
Type
Supplies
44610000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Vattenfall N.V. intends to establish a heat station in Zeeburg, Amsterdam. The tender concerns the production, delivery, and installation of a heat buffer tank (Lot 1). The tank serves as accumulation and backup storage for heat, which is sent to the district via a booster and a heat supply network. The contracting authority requests a complete delivery and installation service, including fabrication, transport, installation, testing, and commissioning. The scope includes technical specifications for material, dimensions, capacity, safety standards (e.g., ISO 9001, ISO 14001, local building and safety regulations), and integration with the rest of the heat station. The procedure is non-public, meaning a limited number of pre-selected suppliers may be invited. The assignment requires a reliable partner with experience in thermal storage, HVAC installations, and project management within the energy sector.

Supplies · Restricted · European procedure

European
Contracting authority
Contract type
Supplies
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Amsterdam
CharacteristicsCPV 44SuppliesEU tenderheat buffer tankheat accumulatorZeeburg

01What is being requested

Vattenfall N.V. intends to establish a heat station in Zeeburg, Amsterdam. The tender concerns the production, delivery, and installation of a heat buffer tank (Lot 1). The tank serves as accumulation and backup storage for heat, which is sent to the district via a booster and a heat supply network. The contracting authority requests a complete delivery and installation service, including fabrication, transport, installation, testing, and commissioning. The scope includes technical specifications for material, dimensions, capacity, safety standards (e.g., ISO 9001, ISO 14001, local building and safety regulations), and integration with the rest of the heat station. The procedure is non-public, meaning a limited number of pre-selected suppliers may be invited. The assignment requires a reliable partner with experience in thermal storage, HVAC installations, and project management within the energy sector.

Vattenfall intends to realize a heat station in the Zeeburg district in Amsterdam, consisting of a heat buffer and booster for peak and backup heat supply. For the procurement and execution, a subdivision has been made into three technical disciplines (Lots). Lot 1; Heat Buffer Tank (Heat Accumulation Tank), Lot 2; Installation Technology (Process), which includes but is not limited to the delivery of required materials, components in the fields of electrical/instrumentation and mechanical, the installation, testing, and commissioning, Lot 3; Civil engineering works, consisting of but not

44610000Supplies
1Lot 1

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for leveringen is € 221.000, for reference.

04Likely competitors

#Likely bidderFitWins
1Heijmans Infra B.V.SME9246×
2SPIE Nederland B.V.SME8015×
3KTK B.V.SME7811×
4Van Hattum & Blankevoort N.V.SME7314×
5MobilisUnknown7213×
6N.V. Vattenfall Sales NederlandSME71

05Legal themes that may be relevant here

06Frequently asked questions

What is the specific scope of Lot 1 within this assignment?
The assignment for Lot 1 concerns the production, delivery, and installation of the Heat Buffer Tank (Heat Accumulation Tank) for the heat station in Zeeburg.
Which technical disciplines are part of the total realization of the heat station?
The realization is divided into three technical disciplines: Lot 1 (Heat Buffer Tank), Lot 2 (Installation Technology/Process), and Lot 3 (Civil engineering works).
What is the function of the heat buffer tank in the Zeeburg district?
The heat buffer tank serves as accumulation and backup storage for heat, which is sent to the district via a booster and a heat supply network.
What does the scope of the installation technology (Lot 2) include?
Lot 2 includes the delivery of materials and components in the fields of electrical, instrumentation, and mechanical, as well as the installation, testing, and commissioning.
What are the activities within the civil engineering works (Lot 3)?
The civil engineering works consist of, among other things, the realization of foundations and the building.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 393K
median
€ 1,0 mln
p75
€ 5,0 mln
deze opdracht

Gegunde waarden in CPV 44 · leveringen n=425