ClosedWorksEuropeanRestricted

Haamstede Realisation Demineralization

Evides NV · Restricted · 1 lots · 350595
Type
Works
45220000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Evides NV has a non-public procedure for the construction of a new demineralization building at the Haamstede production location, located in a Natura2000 area. The building (≈25 m × 28 m, 12 m high) requires a complex civil construction with concrete basements, steel and concrete structures, sandwich panels, and natural stone facades. Additionally, protected flora and fauna, a delivery area, a CO₂ setup, and the coordination of various subcontractors (WTB, E&I, site utilities, chemistry) must be taken into account. The contract requires an experienced contractor with expertise in civil structures, environmental management, and project coordination.

Works · Restricted · European procedure

European
Contracting authority
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderDemineralizationNatura2000sandwich panels

01What is being requested

Evides NV has a non-public procedure for the construction of a new demineralization building at the Haamstede production location, located in a Natura2000 area. The building (≈25 m × 28 m, 12 m high) requires a complex civil construction with concrete basements, steel and concrete structures, sandwich panels, and natural stone facades. Additionally, protected flora and fauna, a delivery area, a CO₂ setup, and the coordination of various subcontractors (WTB, E&I, site utilities, chemistry) must be taken into account. The contract requires an experienced contractor with expertise in civil structures, environmental management, and project coordination.

The civil scope includes a new Demineralization Building (dimensions approximately 25 m x 28 m, highest point = 12 m) based on a detailed specification (Technical Design). The new demineralization building at the Haamstede production location is located in a dune area which is part of Natura2000. On the site, protected flora and fauna must be taken into account. The substructure of the Demineralization Building contains concrete basements and concrete floors on a pile foundation. The superstructure consists of a main load-bearing steel structure, concrete floors, steel roof sheets, and a water

45220000Works
1Haamstede Realisation Demineralization€1

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1KWS Infra B.V.SME9892×
2BAM Infra B.V.SME9877×
3Combinatie Heijmans - SWARCOUnknown9873×
4Boskalis Nederland B.V.SME9869×
5Heijmans Infra B.V.SME9865×
6Dura Vermeer Infra Regionale Projecten BVSME9758×

05Legal themes that may be relevant here

06Frequently asked questions

What does the civil scope of the contract entail?
The contract includes the realisation of a new demineralization building with dimensions of approximately 25 m x 28 m and a highest point of 12 m. The construction consists of a substructure with concrete basements and floors on a pile foundation, a superstructure with a steel structure, concrete floors, steel roof sheets, and a water-bearing concrete structure for the cascade rooms. The facade is executed in sandwich panels with natural stone tiles.
Which specific environmental factors must be considered during the realisation?
The demineralization building is being realised at the Haamstede production location in a dune area that is part of Natura2000. During the works on site, the present protected flora and fauna must be taken into account.
What coordination tasks are involved for the civil contractor?
The civil contractor is assigned the obligation to take over the coordination of various subcontractors, including parties for WTB, E&I, site utilities, and chemistry.
Which additional objects outside the main building are part of the contract?
In addition to the demineralization building, there is a delivery area and a CO2 setup located outside the building.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159