AwardedWorksEuropeanOpen

Major maintenance N377 (De Pol - Slagharen)

Provincie Overijssel · Open · 1 lots · 271571
Type
Works
45233139
Estimated value
€ 3,59M
awarded
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Provincie Overijssel is carrying out a major maintenance project on the N377, an important regional traffic artery between De Pol and Slagharen. The project focuses on improving traffic flow and increasing road safety. Following previous works within the Vechtdalverbinding project, several parts of the road still require maintenance: the carriageway, lay-bys, breakdown areas, the Reestviaduct, and a roundabout with the Industrieweg. The objective is to make the road maintenance-free for 12 years, representing a significant extension of the infrastructure's lifespan. The works include large-scale road improvements, adjusting traffic lights, repairing the road structure, and optimizing the infrastructure around the viaduct and the roundabout. The tender is open and aimed at companies with experience in large-scale road maintenance works, road safety projects, and working on existing infrastructure.

Works · Open · European procedure

European
Contracting authority
Contract type
Works
Open
Estimated value
€3,591,000
awarded value
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Zwolle
CharacteristicsCPV 45WorksEU tenderN377major maintenanceroad safety

01What is being requested

Provincie Overijssel is carrying out a major maintenance project on the N377, an important regional traffic artery between De Pol and Slagharen. The project focuses on improving traffic flow and increasing road safety. Following previous works within the Vechtdalverbinding project, several parts of the road still require maintenance: the carriageway, lay-bys, breakdown areas, the Reestviaduct, and a roundabout with the Industrieweg. The objective is to make the road maintenance-free for 12 years, representing a significant extension of the infrastructure's lifespan. The works include large-scale road improvements, adjusting traffic lights, repairing the road structure, and optimizing the infrastructure around the viaduct and the roundabout. The tender is open and aimed at companies with experience in large-scale road maintenance works, road safety projects, and working on existing infrastructure.

At various locations on the N377, Provincie Overijssel is working to improve traffic flow and increase road safety. Over the past few years, measures have been implemented on various parts of the N377 within the Vechtdalverbinding project. For the N377, a section of regular major maintenance remains for the carriageway, lay-bys, breakdown areas, Reestviaduct, and the roundabout with the Industrieweg. The goal is for the road to be maintenance-free for another 12 years.

45233139Works
1Lot 1

02Outcome

Awarded

KWS Infra BV

Award value
€3,591,000

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

05Bidders in this segment

#Likely bidderFitWins
1KWS Infra B.V.SME10092×
2BAM Infra B.V.SME10077×
3NTP B.V.SME10022×
4Van Gelder BVSME9953×
5Boskalis Nederland B.V.SME9969×
6Heijmans Infra B.V.SME9865×

06Legal themes that may be relevant here

07Frequently asked questions

What is the objective of the maintenance on the N377?
The objective of the major maintenance to the carriageway, lay-bys, breakdown areas, the Reestviaduct, and the roundabout with the Industrieweg is to make the road maintenance-free for another 12 years.
Which parts of the infrastructure are being addressed?
The works include maintenance to the carriageway, lay-bys, breakdown areas, the Reestviaduct, and the roundabout at the Industrieweg.
What are the main improvement points of this project?
The project focuses on improving traffic flow and increasing road safety on the N377 between De Pol and Slagharen.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 3,6 mln

Gegunde waarden in CPV 45 · werken n=3159