AwardedWorksRestricted

Major maintenance BR0373 Brug Halfweg

Gemeente Haarlemmermeer · Restricted · 1 lots · 275455
Type
Works
45221119
Estimated value
€ 2,45M
awarded
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Haarlemmermeer has a non-public tender for major maintenance of the Brug Halfweg (BR0373). The contract comprises a wide range of works, including the overhaul and replacement of operation, control, and drive systems, the grit blasting and preservation of steel components, and the replacement of braking and guidance systems. Additionally, bearing points, asphalt paving, tiles, pavers, and concrete slabs will be renewed. The maintenance of joints, railings, and concrete work is also part of the contract. For safety and the preservation of the bridge, a temporary bank connection for cyclists and pedestrians will be installed, along with temporary traffic measures. The works require a combination of mechanical, electrical, structural, and roadworks expertise, with attention to safety and minimal disruption to traffic.

Works · Restricted · National procedure

Contracting authority
Contract type
Works
Restricted
Estimated value
€2,445,540
awarded value
Submission deadline
Ongoing
10:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Hoofddorp
CharacteristicsCPV 45Worksbridge maintenancebridge maintenancemechanical overhaul

01What is being requested

The Municipality of Haarlemmermeer has a non-public tender for major maintenance of the Brug Halfweg (BR0373). The contract comprises a wide range of works, including the overhaul and replacement of operation, control, and drive systems, the grit blasting and preservation of steel components, and the replacement of braking and guidance systems. Additionally, bearing points, asphalt paving, tiles, pavers, and concrete slabs will be renewed. The maintenance of joints, railings, and concrete work is also part of the contract. For safety and the preservation of the bridge, a temporary bank connection for cyclists and pedestrians will be installed, along with temporary traffic measures. The works require a combination of mechanical, electrical, structural, and roadworks expertise, with attention to safety and minimal disruption to traffic.

The contract mainly comprises the following works:den- Overhaul/replacement of operation and control systems;den- Overhaul/replacement of drive and movement systems;den- Grit blasting and preservation (coating) of steel components;den- Replacement of braking and guidance systems + waiting areas;den- Replacement of bearing points;den- Replacement of adjacent asphalt paving;den- Re-laying of tiles and paver paving;den- Replacement of wearing course on pedestrian deck;den- Replacement of concrete slabs;den- Maintenance of masonry joints;den- Preservation of railings;den- Cleaning and preservation

45221119Works
1Lot 1

02Outcome

Awarded

SPIE Nederland B.V.

Award value
€2,445,540

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Bidders in this segment

#Likely bidderFitWins
1KWS Infra B.V.SME10092×
2BAM Infra B.V.SME10077×
3Dura Vermeer Infra Regionale Projecten BVSME10058×
4Combinatie Heijmans - SWARCOUnknown9873×
5Heijmans Infra B.V.SME9865×
6ENGIE Infra & Mobility B.V.SME9769×

05Tender documents

TN381298 - SF03 Aankondiging van een gegunde opdracht 20230321160508pdfMar 21, 2023 · 26 KB
TN381298 - SF14 Kennisgeving van aanvullende informatie, informatie over een onvolledige procedure of rectificatie 20221024141809pdfOct 24, 2022 · 13 KB
Bijlage A UEA DocumentpdfOct 24, 2022 · 2097 KB
2022-10-24 Nota van Inlichtingen 1 GO Brug HalfwegpdfOct 24, 2022 · 126 KB
Bijlage B Model ReferentieprojectdocxOct 10, 2022 · 53 KB
Bijlage C Verklaring bekwaamheid derdedocxOct 10, 2022 · 50 KB
Bijlage A UEA DocumentpdfOct 10, 2022 · 2097 KB
Bijlage Y Social Return_aug2022pdfOct 10, 2022 · 49 KB
TN381298 - SF02 Aankondiging van een opdracht 20221010104950pdfOct 10, 2022 · 30 KB
Bijlage D Verklaring aansprakelijkheid derdedocxOct 10, 2022 · 50 KB
2022-10-10 Selectieleidraad GO Brug HalfwegpdfOct 10, 2022 · 538 KB

06Legal themes that may be relevant here

07Frequently asked questions

What are the main works involved in the major maintenance of Brug Halfweg?
The works include the overhaul or replacement of operation, control, drive, and movement systems, the grit blasting and preservation of steel components, and the replacement of braking and guidance systems, bearing points, asphalt paving, tiles, pavers, and concrete slabs.
What measures are taken for traffic safety during the works?
For safety and the preservation of the bridge, a temporary bank connection for cyclists and pedestrians will be installed and temporary traffic measures will be applied.
Which maintenance tasks are included for the masonry and concrete?
The contract includes the maintenance of joints in the masonry, the preservation of railings, and the cleaning and preservation of concrete work.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 2,4 mln

Gegunde waarden in CPV 45 · werken n=3159