AwardedWorksOpen

Land sale Uithuizen centre

gemeente Het Hogeland · Open · 1 lots · 412179
Type
Works
45000000 · Construction work
Estimated value
Not published
To deadline
Ongoing
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence moderate

This visual quality plan establishes the spatial and architectural boundary conditions for the redevelopment of the Molenerf in Uithuizen, including the supermarkets and surrounding new construction. The goal is to strengthen the urban structure and transform the area from an isolated enclave into a high-quality connection within the village centre.

Works · Open · National procedure

Contracting authority
Contract type
Works
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
16:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Construction work
Location
Netherlands
CharacteristicsCPV 45Works

01What is being requested

This concerns the spatial boundary conditions for the developments around the east pole of the halter in Uithuizen, specifically the Molenerf. The assignment includes the qualitative integration of the supermarkets (Lidl and Jumbo), the public space, and the real estate development (including the former SNS location and a transformer and toilet building) within the historical and urban planning context.

Land sale Uithuizen centre. As part of the Uithuizen Centre Plan, a solution is now being sought for the former SNS location as the final piece for the entire Molenerf development. Through the redesign of the Molenerf, space is created for an expansion of the Jumbo supermarket and the construction of apartments with a commercial plinth.

45000000Works
1Land sale Uithuizen centre

02Outcome

Awarded

KHV Architecten B.V.

Bidders
2

03Strategic insight

Strategic insight · AI analysis
Ensure an integrated design where the architecture and the layout of the outdoor space connect seamlessly to guarantee the connection between the Molenerf and the Blink. Strictly adhere to the urban planning frameworks regarding building lines, plinth transparency, and material use to align with the historical context of Uithuizen. When designing the commercial plinths, focus on maximum transparency and glass fronts to facilitate the desired catering and retail experience.
Read automatically from the tender documents using AI. Always verify against the original documents.

04Points of attention

Important · 7
Visual quality must align with the General Hogerlandster Criteria.Important
Architecture should align with the village masonry tradition using orange-red fired materials.Important
Building height at the Blink is 2 storeys plus roof, with a possible accent of 3 storeys plus roof on the Southwest corner.Important
Roof shape for buildings on the SNS plot must be a symmetrical gable roof with a maximum slope of 50 degrees.Important
Facade openings must have a vertical ratio of at least 4:3 (h:w) and the window frames must be recessed into the facade surface.Important
Outdoor spaces at the new construction at the Blink must be implemented internally (within the building line); preference is given to French balconies instead of protruding balconies.Important
Material use: only 1 type/color of masonry brick may be applied and dark ceramic tiles must be used on the roof.Important

05Can I take part?

Technical — Selection criteria have been drawn up for the transformer and toilet building, which serve as a guideline for the selection of architects.

06Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

07Bidders in this segment

#Likely bidderFitWins
1Boskalis Nederland B.V.SME9569×
2Van Gelder BVSME9553×
3BAM Bouw en Techniek bvSME9434×
4KWS Infra B.V.SME9392×
5BAM Infra B.V.SME9377×
6Croonwolter&dros B.V.SME9125×

08Tender documents

Bijlage 2. KHV Schets Appartementen Boven JumbopdfFeb 13, 2026 · 5716 KB
TN571989 - EFE3 Vrijwillige aankondiging van een opdracht 20260213114906pdfFeb 13, 2026 · 140 KB
Bijlage 4. Concept - SNS Locatie - Koop-realisatieovkpdfFeb 13, 2026 · 301 KB
Bijlage 1. Molenerf BKPpdfFeb 13, 2026 · 22493 KB
Bijlage 3. (DO) Supermarkt d.d. 28 maart 2025pdfFeb 13, 2026 · 5330 KB
Bijlage 5. Perceel Blink V- 1572 tbv woningbouw - UithuizenpdfFeb 13, 2026 · 161 KB
DEF Uitvraag inschrijving SNS LocatiedocxFeb 13, 2026 · 2486 KB
Bijlage 6. Verklaring-UitsluitingsgrondenpdfFeb 13, 2026 · 626 KB

09Legal themes that may be relevant here

10Frequently asked questions

What spatial boundary conditions apply to the development of the Molenerf?
The development must comply with the Molenerf Visual Quality Plan (August 2024), in which the qualitative integration of the supermarkets into the historical context and the layout of the outdoor space are secured.
What requirements must a bidder meet regarding capacity?
There are no additional requirements for required capacity or certification levels. It is sufficient to demonstrate that the offices and procedures are compliant with basic standards, such as ESG reporting and the own minimum capital.
What is the specific context of the location in question?
It concerns the former SNS location (locally known as Blink 5), located on the Brink. The location is being used as the final piece for the entire Molenerf development, whereby the urban planning situation is being adjusted.

Automatically compiled from the official tender data and documents.

11Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159