AwardedServicesEuropeanOpenGreen

Green renovation works Municipality of Voorne aan Zee

gemeente Voorne aan Zee · Open · 1 lots · 384360
Type
Services
77310000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence high

Framework agreement for green renovation works at the Municipality of Voorne aan Zee with a duration of two years. The works are carried out via individual assignments and include various soil and planting works.

Services · Open · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Services
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
09:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 77ServicesEU tenderGreen / SPP

01What is being requested

The assignment concerns green renovation works for the Municipality of Voorne aan Zee, carried out via individual assignments. The works include, among other things, the removal of vegetation, soil improvement, planting, sowing, and aftercare over a period of 2 years.

The objective of this procurement is to conclude a framework agreement for green renovations within the Municipality of Voorne aan Zee. Green renovations include the targeted renewal, improvement, and repair of existing green facilities in public spaces.

77310000Services
1Green renovation works Municipality of Voorne aan Zee

02Outcome

Awarded

Wallaard Groen B.V.

Bidders
7

03Strategic insight

Strategic insight · AI analysis
Ensure strict compliance with quality assurance and the specified stopping points during execution. Take into account the continuous execution of works within the specified terms per individual assignment. Pay specific attention to the aftercare and the maintenance period of 26 weeks.
Read automatically from the tender documents using AI. Always verify against the original documents.

04Points of attention

Important · 6
The contracting authority has a unilateral option to extend by 2 x 1 year.Important
In the event of late delivery of an individual assignment, a penalty of € 500.00 per day may be imposed.Important
The planting of trees and rootstock may in principle only take place between October 1st and March 1st.Important
The contractor must submit a schedule for every individual assignment.Important
Storage of equipment or materials is not possible.Important
Theft and vandalism up to delivery are at the risk of the contractor.Important

05Can I take part?

Other — possess a quality system relating to the nature of the work in accordance with article 01.13.01 of the Standard

06Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

07Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.

08Bidders in this segment

#Likely bidderFitWins
1Donker Groep B.V.SME10087×
2Krinkels B.V.SME10066×
3idverde Realisatie B.V.SME10046×
4SIGHT Landscaping b.v.SME10028×
5SIGHT Landscaping (SIGHT Landscaping b.v.)SME10029×
6Verkuil & Moree B.V.SME10022×

09Tender documents

TN530213 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20250908112212pdfSep 9, 2025 · 11 KB
Raambestek Groenrenovatiewerkzaamheden - NvIpdfJul 15, 2025 · 54 KB
Nota van inlichtingen 2025-07-15-1pdfJul 15, 2025 · 12 KB
Raambestek Groenrenovatiewerkzaamheden - NvInsxJul 15, 2025 · 9 KB
Bijlage 9 - Waarderingsmogelijkheden Social returnpdfJul 1, 2025 · 4172 KB
Bijlage 5 - Uniform Europees Aanbestedingsdocument (UEA)pdfJul 1, 2025 · 315 KB
Bijlage 6 - ReferentieformulierdocxJul 1, 2025 · 62 KB
TN530213 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20250630080859pdfJul 1, 2025 · 11 KB
Bijlage 7 - Concept raamovereenkomstdocxJul 1, 2025 · 2267 KB
Bijlage 1 -Raambestek GroenrenovatiewerkzaamhedenpdfJul 1, 2025 · 1762 KB
Bijlage 4 - Inschrijfstaat Raambestek GroenrenovatiewerkzaamhedenpdfJul 1, 2025 · 230 KB
Bijlage 2 -V&G-plan Ontwerpfase, door aannemer te actualiserenpdfJul 1, 2025 · 465 KB

10Legal themes that may be relevant here

11Frequently asked questions

What is the purpose of the framework agreement for green renovation works?
The framework agreement is intended for the targeted renewal, improvement, and repair of existing green facilities in public spaces within the Municipality of Voorne aan Zee.
Which works fall under the scope of the green renovations?
The works include, among other things, the removal of vegetation or grass, soil improvement, soil cultivation, planting activities (such as trees, shrubs, and perennials), sowing, and repair of lawns.
Which conditions apply to the execution of the works?
The execution of the works takes place under the Uniforme Administratieve Voorwaarden voor de uitvoering van werken en van technische installatiewerken 2012 (UAV 2012).
What aftercare period applies after planting trees?
Aftercare and a guarantee apply for 2 years after planting.

Automatically compiled from the official tender data and documents.

12Estimated value versus the market

p25
€ 260K
median
€ 600K
p75
€ 1,8 mln
deze opdracht

Gegunde waarden in CPV 77 · diensten n=1648