The tender for civil engineering works for the Green Heat Diemen project closed on 19 September 2018. N.V. Nuon Energy has built a 120 MWth biomass-fired heat supply in Diemen and is now seeking a contractor for the design, procurement, construction, commissioning, and delivery of the civil engineering works.
Works · Restricted · European procedure
01What is being requested
The tender for civil engineering works for the Green Heat Diemen project closed on 19 September 2018. N.V. Nuon Energy has built a 120 MWth biomass-fired heat supply in Diemen and is now seeking a contractor for the design, procurement, construction, commissioning, and delivery of the civil engineering works.
Nuon develops district heating projects in the Amsterdam metropolitan area. The Green Diemen Project, situated in Diemen region is necessary to support the regional growth of residential heat connections and includes a up to 120 MWth Heat Production Facility utilising wood pellets hereafter referred to as GHD, in Diemen.
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What is the scope of the civil engineering works for the Green Heat Diemen project?
What is the purpose of the heat supply in the Diemen region?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln