Integrated Waste Information System
Municipality of Midden-Groningen seeks one integral contractor for an integrated waste information system with a maximum duration of ten years. The award will take place based on the best price-quality ratio via a system of monetary added value.
Services · Open · European procedure
01What is being requested
The assignment concerns the delivery, implementation, integration, management, and further development of an integrated waste information system for the entire waste chain. The duration is 4 years with 3 options for extension of 2 years (maximum duration 10 years) and the total estimated value is approximately €5,900,000.
The municipality is looking for a future-proof and coherent waste information landscape that supports the entire waste chain and in which processes, systems, and data flows are structurally and manageably interconnected.
02Strategic insight
Focus on the monetary added value by providing a very strong substantiation of the quality criteria K1 through K5, as these fictitiously lower the bid price. Ensure an integral design where the coherence between the system domains (such as CMS, BSA, and links with JAMA/Jewel) is central to achieve the highest score on K2. Prepare a concrete migration plan that guarantees the continuity of critical processes to meet the requirements of K4.
03Points of attention
04Can I take part?
05Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
06Award criteria
Insight into the extent to which the offered solution aligns with the functional requirements from the Program of Requirements. Assessment is based on the number of points achieved.
Assessment of the extent to which the solution provides integral support to the waste chain, the architecture, data flows, data organization, and operational stability.
Demonstration of the operation of the solution in an operational environment, including specific processes such as container management, access control, and links.
Insight into how the implementation, migration, and commissioning are designed, including planning, migration approach, and safeguarding continuity.
Insight into the implementation of further development, cooperation, knowledge safeguarding, and the degree of operational independence of the contracting authority.
The bid price is determined by the initial costs, the forecast annual costs over the initial term of 4 years, and other costs.
07Process & timeline
08Value in context
09Likely competitors
10Tender documents
11Legal themes that may be relevant here
12Frequently asked questions
What is the objective of this assignment?
What is the reason for this tender?
Which procurement conditions apply?
In what form will the agreements be recorded?
Automatically compiled from the official tender data and documents.
13Estimated value versus the market
€ 327K
€ 800K
€ 2,5 mln
Gegunde waarden in CPV 72 · diensten n=1436