AwardedWorksRestricted

South-West Area Realisation Fokkertunnel HOV3 Eindhoven R-566700

ProRail B.V. · Restricted · 1 lots · 277198
Type
Works
45000000
Estimated value
€ 1,94M
awarded
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

ProRail B.V. is conducting a national (non-)open procedure for the realisation of the HOV3 line in Eindhoven. The contract concerns the modification of the level crossing and access roads at the Anthony Fokkerweg to create a segregated bus lane. This includes deepening the cycle path north of the current road, stabilising the embankment via nailing, and taking into account the existing foil construction under the access roads, including the retaining wall and clamping construction of the structure. The works are limited to the rail zone and must comply with the requirements of ARN2016 part II. Given the cross-border interest, the contract has been published at the European level. The focus lies on the safe and technically correct modification of the infrastructure to realise the HOV3 line, with attention to the integration of the new bus lane, the existing rail structures, and the stability of the terrain.

Works · Restricted · National procedure

Contracting authority
Contract type
Works
Restricted
Estimated value
€1,937,000
awarded value
Submission deadline
Ongoing
12:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Utrecht
CharacteristicsCPV 45WorksHOV3Fokkertunnelbus lane

01What is being requested

ProRail B.V. is conducting a national (non-)open procedure for the realisation of the HOV3 line in Eindhoven. The contract concerns the modification of the level crossing and access roads at the Anthony Fokkerweg to create a segregated bus lane. This includes deepening the cycle path north of the current road, stabilising the embankment via nailing, and taking into account the existing foil construction under the access roads, including the retaining wall and clamping construction of the structure. The works are limited to the rail zone and must comply with the requirements of ARN2016 part II. Given the cross-border interest, the contract has been published at the European level. The focus lies on the safe and technically correct modification of the infrastructure to realise the HOV3 line, with attention to the integration of the new bus lane, the existing rail structures, and the stability of the terrain.

The tender is being conducted as a national (non-)open procedure based on ARN2016 part II. To realise the HOV3 line (third High-Quality Public Transport line) in Eindhoven, the level crossing and access roads at the Anthony Fokkerweg must be modified to make room for the new bus lane. A modification of the level crossing is necessary to accommodate a segregated bus lane. North of the current Anthony Fokkerweg, the cycle path will be deepened (excavated) to realise a single bus lane, whereby the embankment is stabilised via nailing. For the construction phase, due consideration must be given t

45000000Works
1Lot 1

02Outcome

Awarded

Dura Vermeer Infra Regionale Projecten BV

Award value
€1,937,000

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Bidders in this segment

#Likely bidderFitWins
1Hegeman Bouw & Infra B.V.SME10031×
2Dura Vermeer Infra Regionale Projecten BVSME10058×
3BAM Infra B.V.SME9977×
4Heijmans Infra B.V.SME9765×
5Boskalis Nederland B.V.SME9769×
6KWS Infra B.V.SME9692×

05Legal themes that may be relevant here

06Frequently asked questions

What is the specific content of the works for the realisation of the HOV3 line?
The works include the modification of the level crossing and access roads at the Anthony Fokkerweg for a new bus lane. This involves deepening the cycle path north of the current road and stabilising the embankment via nailing.
Which technical points of attention are important during the construction phase?
During the construction phase, account must be taken of the existing foil construction under the access roads and the associated connections, including the retaining wall and the clamping construction of the structure.
To which zone are the works limited?
The contract is limited to the necessary modifications for the benefit of the HOV3 in the rail area.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 1,9 mln

Gegunde waarden in CPV 45 · werken n=3159