ProRail B.V. is launching a national open procedure (ARN2016 Part III) for the design and realisation of wooden noise barriers in Dorst, municipality of Oosterhout. The total length of the barriers is approximately 500 meters. The object concerns a UAV-gc agreement for (detailed) design and execution. In consultation with the stakeholder, binding agreements have been made regarding the materialisation and execution: only wooden barriers/panels are permitted; other types of barriers or alternatives are excluded. The assignment requires an integrated approach to design, material selection, construction, and integration into the environment, with attention to appearance and environmental impact. The procedure is open, allowing all interested parties to bid.
Works · Open · National procedure
01What is being requested
ProRail B.V. is launching a national open procedure (ARN2016 Part III) for the design and realisation of wooden noise barriers in Dorst, municipality of Oosterhout. The total length of the barriers is approximately 500 meters. The object concerns a UAV-gc agreement for (detailed) design and execution. In consultation with the stakeholder, binding agreements have been made regarding the materialisation and execution: only wooden barriers/panels are permitted; other types of barriers or alternatives are excluded. The assignment requires an integrated approach to design, material selection, construction, and integration into the environment, with attention to appearance and environmental impact. The procedure is open, allowing all interested parties to bid.
The procurement is conducted as a national open procedure based on ARN2016 Part III. ProRail wishes to realise noise reduction measures in Dorst (municipality of Oosterhout) with a total length of approximately 500 meters. The object of the tender concerns a UAV-gc agreement for (detailed) design and the realisation of the noise barriers. Due to appearance and/or integration into the environment, binding agreements have been made with the stakeholder regarding the materialisation and execution of the barriers, namely wooden barriers/panels. Other (types of) barriers or alternatives are not per
02Outcome
Schreuder Bouwen Langs Water en Wegen B.V.
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
04Bidders in this segment
05Legal themes that may be relevant here
06Frequently asked questions
What is the scope of the noise barriers to be realised?
What materialisation is required for the noise barriers?
What is the nature of the agreement for this project?