ClosedWorksRestrictedGreen

North-West Area - Replacing TTI control Schipholspoortunnel (L-005433)

ProRail B.V. · Restricted · 1 lots · 365159
Type
Works
45000000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The tender (‘North-West Area - Replacing TTI control Schipholspoortunnel (L-005433)’) concerns a non-public works tender procedure by ProRail B.V. The objective is the replacement and renewal of the Tunnel Control Installation (TBI) and related installations in the Schipholspoortunnel, including integration with the central control system and the addition of remote monitoring functions. The schedule focuses on execution in the fourth quarter of 2027 and the first quarter of 2028.

Works · Restricted · National procedure

Sustainability counts
Contracting authority
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
10:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksGreen / SPP

01What is being requested

The tender (‘North-West Area - Replacing TTI control Schipholspoortunnel (L-005433)’) concerns a non-public works tender procedure by ProRail B.V. The objective is the replacement and renewal of the Tunnel Control Installation (TBI) and related installations in the Schipholspoortunnel, including integration with the central control system and the addition of remote monitoring functions. The schedule focuses on execution in the fourth quarter of 2027 and the first quarter of 2028.

The Tunnel Technical Installation and a number of (auxiliary) installations of the Schipholspoortunnel must be renewed and/or replaced due to the end of technical service life or updated insights. Most of the execution is planned for Q4 2027 and Q1 2028. The scope roughly consists of: - Replacing the Tunnel Control Installation (TBI) in accordance with the ProRail Tunnel Standard (PTS); - Integrating the TBI into the central control system of ProRail; - Adjusting various sub-installations to enable remote monitoring.

45000000Works
1North-West Area - Replacing TTI control Schipholspoortunnel (L-005433)

02Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

03Likely competitors

#Likely bidderFitWins
1Anton Rail & Infra B.V.SME9921×
2VolkerRail Nederland B.V.SME9930×
3SPIE Nederland B.V.SME9923×
4ENGIE Infra & Mobility B.V.SME9869×
5BAM Infra B.V.SME9777×
6BAM Bouw en Techniek bvSME9734×

04Legal themes that may be relevant here

05Frequently asked questions

What is the exact scope of the works in the Schipholspoortunnel?
The scope includes the replacement of the Tunnel Control Installation (TBI) in accordance with the ProRail Tunnel Standard (PTS), the integration of the TBI into the central control system of ProRail, and the adjustment of various sub-installations for remote monitoring.
When will the execution of the works take place?
The execution of the works is scheduled for the fourth quarter of 2027 and the first quarter of 2028.
What is the reason for this replacement of the installations?
The Tunnel Technical Installation and various auxiliary installations must be renewed or replaced due to the end of their technical service life or updated insights.

Automatically compiled from the official tender data and documents.

06Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159