Area Noord-West - Realization of track and platform adjustments Heerhugowaard L-005322
This tender concerns the realization of track and platform adjustments at Heerhugowaard station in the northwestern part of the Netherlands. ProRail B.V. intends to transform the station into a 2-track station with side platforms. The third platform track (track 203) must be decommissioned, additional crossover switches must be decommissioned, and the superstructure will be renewed. The level crossings of track 3 will be adjusted to the new 2-track situation. The platform of track 1 will be widened to at least 3.92 m and the island platform 2/3 will be converted into a side platform for track 2. Furniture, platform access, layout, and the reception area will also be changed. The works are part of the preparation for the 2-track underpass (tunnel) of the Zuidtangent. The procedure is a negotiated procedure. The contracting authority expects an integrated approach with attention to safety, accessibility, and minimal disruption to the station.
Works · Onderhandse procedure · National procedure
01What is being requested
This tender concerns the realization of track and platform adjustments at Heerhugowaard station in the northwestern part of the Netherlands. ProRail B.V. intends to transform the station into a 2-track station with side platforms. The third platform track (track 203) must be decommissioned, additional crossover switches must be decommissioned, and the superstructure will be renewed. The level crossings of track 3 will be adjusted to the new 2-track situation. The platform of track 1 will be widened to at least 3.92 m and the island platform 2/3 will be converted into a side platform for track 2. Furniture, platform access, layout, and the reception area will also be changed. The works are part of the preparation for the 2-track underpass (tunnel) of the Zuidtangent. The procedure is a negotiated procedure. The contracting authority expects an integrated approach with attention to safety, accessibility, and minimal disruption to the station.
In preparation for the 2-track underpass (tunnel) of the Zuidtangent in Heerhugowaard: - The third platform track (track 203) must be decommissioned. - Additional crossover switches are to be decommissioned. - Superstructure renewals will be carried out simultaneously. - The existing level crossings of track 3 must be adjusted to the new 2-track situation. - Platform furniture will be replaced and adjusted to better align with the widened platform. The Heerhugowaard station will therefore be reduced to a 2-track station with side platforms. Island platform 2/3 must be converted i
02Outcome
Swietelsky Rail Benelux B.V.
03Value in context
04Bidders in this segment
05Legal themes that may be relevant here
06Frequently asked questions
What is the specific content of the works for the track and platform adjustments in Heerhugowaard?
What adjustments will be implemented regarding the platform layout and the width of the platforms?
What is the objective of the realization of the track and platform adjustments at Heerhugowaard station?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159