ClosedWorksOnderhandse procedure

Area Noord-West - Realization of track and platform adjustments Heerhugowaard L-005322

ProRail B.V. · Onderhandse procedure · 1 lots · 307732
Type
Works
45234000
Estimated value
€ 4,55M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

This tender concerns the realization of track and platform adjustments at Heerhugowaard station in the northwestern part of the Netherlands. ProRail B.V. intends to transform the station into a 2-track station with side platforms. The third platform track (track 203) must be decommissioned, additional crossover switches must be decommissioned, and the superstructure will be renewed. The level crossings of track 3 will be adjusted to the new 2-track situation. The platform of track 1 will be widened to at least 3.92 m and the island platform 2/3 will be converted into a side platform for track 2. Furniture, platform access, layout, and the reception area will also be changed. The works are part of the preparation for the 2-track underpass (tunnel) of the Zuidtangent. The procedure is a negotiated procedure. The contracting authority expects an integrated approach with attention to safety, accessibility, and minimal disruption to the station.

Works · Onderhandse procedure · National procedure

Contracting authority
Contract type
Works
Onderhandse procedure
Estimated value
€4,550,000
estimated value
Submission deadline
Ongoing
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Utrecht
CharacteristicsCPV 45WorksTrackPlatformHeerhugowaard

01What is being requested

This tender concerns the realization of track and platform adjustments at Heerhugowaard station in the northwestern part of the Netherlands. ProRail B.V. intends to transform the station into a 2-track station with side platforms. The third platform track (track 203) must be decommissioned, additional crossover switches must be decommissioned, and the superstructure will be renewed. The level crossings of track 3 will be adjusted to the new 2-track situation. The platform of track 1 will be widened to at least 3.92 m and the island platform 2/3 will be converted into a side platform for track 2. Furniture, platform access, layout, and the reception area will also be changed. The works are part of the preparation for the 2-track underpass (tunnel) of the Zuidtangent. The procedure is a negotiated procedure. The contracting authority expects an integrated approach with attention to safety, accessibility, and minimal disruption to the station.

In preparation for the 2-track underpass (tunnel) of the Zuidtangent in Heerhugowaard: - The third platform track (track 203) must be decommissioned. - Additional crossover switches are to be decommissioned. - Superstructure renewals will be carried out simultaneously. - The existing level crossings of track 3 must be adjusted to the new 2-track situation. - Platform furniture will be replaced and adjusted to better align with the widened platform. The Heerhugowaard station will therefore be reduced to a 2-track station with side platforms. Island platform 2/3 must be converted i

45234000€ 4,55MWorks
1Lot 1

02Outcome

Awarded

Swietelsky Rail Benelux B.V.

Award value
€4,550,000
vs. estimate
0%

03Value in context

€4,550,000

04Bidders in this segment

#Likely bidderFitWins
1Strukton Rail Nederland bvSME10034×
2BAM Infra B.V.SME9977×
3VolkerRail Nederland B.V.SME9930×
4Dura Vermeer Infra Regionale Projecten BVSME9858×
5Heijmans Infra B.V.SME9765×
6Swietelsky Rail Benelux B.V.SME9622×

05Legal themes that may be relevant here

06Frequently asked questions

What is the specific content of the works for the track and platform adjustments in Heerhugowaard?
The works include decommissioning the third platform track (track 203) and additional crossover switches, performing superstructure renewals, adjusting the level crossings of track 3, and converting island platform 2/3 into a side platform for track 2.
What adjustments will be implemented regarding the platform layout and the width of the platforms?
The platform of track 1 will be widened to at least 3.92 meters. Additionally, the platform furniture, platform access, layout, and the reception area will be adjusted to the new 2-track situation.
What is the objective of the realization of the track and platform adjustments at Heerhugowaard station?
The adjustments serve as preparation for the realization of the 2-track underpass (tunnel) of the Zuidtangent.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 4,5 mln

Gegunde waarden in CPV 45 · werken n=3159