ClosedWorksOnderhandse procedureGreen

North-West Area - Adjusting considerations for Stoomtram Hoorn-Medemblik Z-170003

ProRail B.V. · Onderhandse procedure · 1 lots · 356872
Type
Works
45234000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

This tender from ProRail B.V. concerns the adjustment or consideration of works for the Stoomtram Hoorn-Medemblik (Z-170003). The procedure is a multiple reduced negotiated procedure, aimed at selecting a suitable contractor for a technically complex project within the railway network. The works include, among other things, adjusting infrastructure, ensuring safety, and minimizing disruptions to the current steam tram route. The contracting authority expects a detailed proposal with a realistic schedule, cost estimate, and a plan for quality and safety management. The selection criteria are based on experience, technical capacity, financial stability, and the ability to deliver within the specified timelines.

Works · Onderhandse procedure · National procedure

Sustainability counts
Contracting authority
Contract type
Works
Onderhandse procedure
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksGreen / SPPsteam tramHoorn-MedemblikProRail

01What is being requested

This tender from ProRail B.V. concerns the adjustment or consideration of works for the Stoomtram Hoorn-Medemblik (Z-170003). The procedure is a multiple reduced negotiated procedure, aimed at selecting a suitable contractor for a technically complex project within the railway network. The works include, among other things, adjusting infrastructure, ensuring safety, and minimizing disruptions to the current steam tram route. The contracting authority expects a detailed proposal with a realistic schedule, cost estimate, and a plan for quality and safety management. The selection criteria are based on experience, technical capacity, financial stability, and the ability to deliver within the specified timelines.

The tender takes place as a multiple reduced negotiated procedure.

45234000Works
11

02Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

03Likely competitors

#Likely bidderFitWins
1VolkerRail Nederland B.V.SME10030×
2Strukton Rail Nederland bvSME9933×
3BAM Infra B.V.SME9877×
4KWS Infra B.V.SME9792×
5Dura Vermeer Infra Regionale Projecten BVSME9658×
6Van Gelder BVSME9553×

04Legal themes that may be relevant here

05Frequently asked questions

What is the scope of the works for the Stoomtram Hoorn-Medemblik?
The assignment concerns the adjustment or consideration of works for the Stoomtram Hoorn-Medemblik (Z-170003), whereby the infrastructure is adjusted and safety is ensured.
Which criteria are applied regarding sustainability?
In this tender, sustainability criteria apply to the execution of the assignment.

Automatically compiled from the official tender data and documents.

06Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159