Area North - Realisation BBV Onnen 2025 FH+FW D-003164A
This is a non-public, negotiated procedure for the realisation of the track superstructure renewal on the Overijsselse / Amsterdamsche railway routes Groningen – Hoogeveen, with an emphasis on function maintenance and modification at the Onnen location and the corresponding track section and lighting.
Works · Onderhandse procedure · National procedure
01What is being requested
This is a non-public, negotiated procedure for the realisation of the track superstructure renewal on the Overijsselse / Amsterdamsche railway routes Groningen – Hoogeveen, with an emphasis on function maintenance and modification at the Onnen location and the corresponding track section and lighting.
The procurement is conducted as a non-public procedure based on the ARN2016 Part II as well as the ProRail Recognition Scheme (EP2019) published as a European call for competition, industry sector Railway Contractors.nKnshort description of works:ntrack superstructure renewal in the context of function maintenance and function modification at various locations on the Groningen – Hoogeveen routes in the 2025 plan year.nThe scope includes the following works:n• Function maintenance and function modification at the Onnen site;n• Function maintenance and function modification on the Onnen – Gronin
02Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
03Likely competitors
04Legal themes that may be relevant here
05Frequently asked questions
What is the specific scope of the works for this project?
On which regulations is this tender based?
Are there any sustainability criteria applicable to this assignment?
Automatically compiled from the official tender data and documents.
06Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159