AwardedSuppliesEuropeanOpenGreen

EU public procurement for the supply and installation of underground waste containers

Gemeente Dijk en Waard · Open · 1 lots · 353371
Type
Supplies
34928480
Estimated value
€ 1,70M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Dijk en Waard has launched an open tender for the supply and installation of underground waste containers. The contract includes the supply of a concrete pit (outer container), an inner container (collector), a pedestrian platform (collector base plate), a safety floor, and an inlet column. In addition, all works necessary for the installation of the container must be carried out. The supplier must ensure a complete, functional, and safe installation, including finishing, drainage, and any connection to existing infrastructure. The contract requires a combination of product supply and technical expertise, with attention to sustainability, safety, and aesthetics. The tender is public and aimed at a broad market, allowing both large and medium-sized companies to participate. The municipality expects a professional, timely, and cost-efficient result, in compliance with all relevant laws and regulations.

Supplies · Open · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Supplies
Open
Estimated value
€1,700,000
estimated value
Submission deadline
Ongoing
11:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 34SuppliesEU tenderGreen / SPPwaste containerconcrete pitcollector

01What is being requested

The Municipality of Dijk en Waard has launched an open tender for the supply and installation of underground waste containers. The contract includes the supply of a concrete pit (outer container), an inner container (collector), a pedestrian platform (collector base plate), a safety floor, and an inlet column. In addition, all works necessary for the installation of the container must be carried out. The supplier must ensure a complete, functional, and safe installation, including finishing, drainage, and any connection to existing infrastructure. The contract requires a combination of product supply and technical expertise, with attention to sustainability, safety, and aesthetics. The tender is public and aimed at a broad market, allowing both large and medium-sized companies to participate. The municipality expects a professional, timely, and cost-efficient result, in compliance with all relevant laws and regulations.

Within the scope of the contract is the supply of: - The concrete pit (outer container); - The inner container (collector); - The pedestrian platform (collector base plate); - The safety floor; - The inlet column. In addition, the contract includes all works necessary for the installation of the container

34928480€ 1,70MSupplies
1Supply and installation of underground waste containers€1,700,000

02Outcome

Awarded

Kliko WTS B.V.

Award value
€124,288
vs. estimate
-93%
Bidders
6

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

€1,700,000

05Bidders in this segment

#Likely bidderFitWins
1Kliko ServiceUnknown9817×
2M.C.B. Milieu & Techniek B.V.SME9612×
3Terberg Matec Nederland B.V.SME9643×
4Newwaste B.V.SME93
5Scania Nederland B.V.SME9338×
6HR Groep Streetcare B.V.SME9223×

06Legal themes that may be relevant here

07Frequently asked questions

What exactly does the contract for the supply of underground waste containers entail?
The contract includes the supply of the concrete pit (outer container), the inner container (collector), the pedestrian platform (collector base plate), the safety floor, and the inlet column. In addition, all works required for the installation of the container are included.
What works are expected during the installation of the containers?
In addition to the supply of the components, the contract includes all works necessary for the installation. This means that the supplier ensures a complete, functional, and safe installation, including finishing, drainage, and any connection to the existing infrastructure.
Are there specific criteria regarding sustainability?
Yes, sustainability criteria apply to this contract.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 280K
median
€ 606K
p75
€ 1,6 mln
€ 1,7 mln

Gegunde waarden in CPV 34 · leveringen n=1101